Change Order #1 Submission, Ambassador Construction, August 1998

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #001 for sheetrock wall offset installation at 7 World Trade Center.

NYC-WTC_000168699–000168700

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floors ®Change Order #001®Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000168700
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JDL??.iqQK SWAHKE HAYDEN CONNELL ARCHITECTS NO. P. 3./3 8-21-98 5IHKE HUBEI GQIIELL AlCIITECTt

EXIST. CONC. SLAB.

^AT ALL VOIDS BETWEEN Z SLAB & TOP RUNNER, PACK TIGHT WITH INSUL.

U’--r± A.F.F. 2 1/2" "J" RUNNER FASTENED TO UNDERSIDE EXIST, MTL. DECK OF MTL, DECK AT 16" O.C. I MAX. I SOUND INSULATION (TYP.) I I T' STUDS AT IS" O.C. I r GYP. LINER I I 2 1/2" "J" RUNNERS EXIST. DUCT —u 1l'- O"± A.F.F, z (TYP.) r-J- I 113 / F-1.----- TAPE & SPACKLE r STUDS © 24“ O.C. ALL JOINTS

VARIES 3 LAYERS 3/8" THK GW0 I I I’-S-i I 1 3 5/8" 25 GA. MTL.- I I 3 5/0’ 25 GA. CHANNEL RUNNER AT 16* O.C. I I MTL. CHANNEL STUDS AT 16" O.C. I I u FINISHED CLG. u ■I A FINISHED CLG. Q- I O

EOC SIDE q: LU Id s CORRIDOR SIDE tn

3 5/8" 25 GA. MTL. CHANNEL RUNNER, FASTEN 4" VINYL BASE. TO FLR. SLAB, 16" O.C. •I 1'. CARPET TILE ,1 I'.

M I' EXIST. SLAB f SEALANT

No. Date revisions Job Tille/Diwing Title Scale . MAYORS OFnCE. .QP..EMERGENCy..MANA.GEMBNT.,. ■" 'Drawn-Sy...... FSK-1 ........... EQC WAa,..QFFSn............ loK-Wa........ Svanke Hayden Connell lid ..... .55,7,6 A, 285 Lafayette St. Ne* York. Ne* York 10012 O ms Swb Hv*a CoomO InblM* 212 226 9696, Fai 212 219 0050

NYC-WTC_000168700

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168700Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #1 for sheetrock work, July 1998 · Box 7DCAS

NYC-WTC_000173185

Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.985

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168702 · Box 7DCAS

Ambassador Construction submits Change Order #001 for sheetrock wall offset work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

Compare copies and versions →