NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7, & 23rd Floors Change Order #001 Amb. Job #S57-5175
Document / 2 pages

Change Order #1 Submission, Ambassador Construction, July 1998

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #001 for sheetrock wall offset work at 7 World Trade Center.

NYC-WTC_000168702–000168703

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7, & 23rd Floors Change Order #001 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168703
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JUL. 22.1998 4;24FM SBNKE HAYDEN CONNELL AECHITECIS NO. 5094 P. 3/3 SWAIKE HaYBEI CQIIELL ArGIITECTS

EXIST. CONC. SLA0.

Z—at all voids between 1/ SLAB de TOP RUNNER, PACK TIGHT WITH INSUL. ? ? \i. J EXIST. MTL. DECK S7 14'--1"± A.F.F. 2 1/2" "J” RUNNER FASTENED TO UNDERSIDE OF MTL. DECK AT 16" O.C. MAX. SOUND INSULATION (TYP.)

T' STUDS AT IS’ O.C. H r GYP, LINER

2 1/2” ''J” RUNNERS EXIST. DUCT n'--O“± A.F.F. (TYP.)

I I r r-i----------- -■ TAPE de SPACKLE

ri 'r STUDS @ 24-" O.C, ALL JOINTS

VARIES 3 LAYERS 5/8" THK GW0 I I 1’-8‘'± I I 3 5/8" 25 GA. MTL.- I I • CHANNEL RUNNER AT 5 5/0' 25 GA. 16’ O.C. mtl. channel studs AT 16" O.C. n?.. FINISHED CLG. o I J,.-.-. Q. I FINISHED CLG. O or EQC SIDE LU 23u 1x1 CORRIDOR SIDE w: 0-

3 5/8” 25 GA. MTL. CHANNEL RUNNER. FASTEN 4" VINYL BASE. TO FLR. SLAB, 16" O.C. CARPET TILE

EXIST. SLAB f SEALANT

No. Me Revisions Job Title/Drawing TiUe Scale MAYORS OFFICE. .QF..EMEBGEN.Cy MANAGEMENT FSK-1 ■Crawn"Sy...... ............ EOC m............. jg KfWo;........ Swanke Hayden Connell Lid ....... 5i5.7.6^. 295 Lafayette SL. Ne* York. New York 10012 O 1995 Svante H^yten Connell ArabHOTte 212 22B 9096. Fai 212 219 0059

NYC-WTC_000168703

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168703Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #1 for sheetrock work, July 1998 · Box 7DCAS

NYC-WTC_000173185

Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938

machine-extracted · confidence unavailable · Check page ↗
Change Order #26 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171821

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

2 shared non-person entities · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168699 · Box 7DCAS

Ambassador Construction submits Change Order #001 for sheetrock wall offset installation at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

Compare copies and versions →