← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #060 Amb. Job #S57-5175
Document / 2 pages

Change Order #60 memo, 7 WTC, Jan 1999

Machine-extracted title · confidence 100%

Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

NYC-WTC_000168513–000168514

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floor Change Order #060 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168513
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JON 26 ’99 16:17 PR OMBfiSSADOR CONSTR. C0212 949 9762 TO 7325190 P. 02/02

AMBASSADOR CONSTRUCTION CO, INC.

♦ January 26, 1999

Mr Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE: Mayor’s Office of Emergency Management 7 World Trade Center 1, 7 & 23rd Floors Change Order #060 Amb. Job # S57-5175

Dear Mr. Weems.

We are pleased to submit herewith our change order #060 to perform the following work at the atxive referenced premises for the sum of EIGHT THOUSAND ONE HUNDRED FOURTEEN DOLLARS ($8,114.00).

SCOPE OF WORK As per Swanke Hayden Connell’s sketch FSK-54 to close gap at steel in hurricane wall with 16 gauge steel plate. The cost is as follows;

Labor 55,500.00 Material 1,500.00 Subtotal $7,000.00 General Conditions 560 00 Overhead & Fee 454 00 Insurance 100.00 Total $9,114.00

Please advise if you wish for us to proceed with this work.

Very tfuly yours.

< CO<STaUCT/)N , INC

Martin Schrlei^r Vice President

MS’.ag cc: Juan Mejia - SHC Glenn Pymento - DCAS

Accepted:_________ Dated: C'\«paocs'ioe(n«ostoemco60 wpdl

317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762

** TOTAL PAGE.02 **

NYC-WTC_000168513

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168513Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000172195 · Box 7DCAS

Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000168456 · Box 7DCAS

Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

Compare copies and versions →