Change order #015 for OEM, 7 World Trade Center, Oct · Box 7DCASNYC-WTC_000171983
Submission of change order #015 by Ambassador Construction Co. to install sleeves and perform firestopping at the Mayor's Office of Emergency Management.
2 shared non-person entities · Same agency, volume and box · similarity 0.965
Change Order #89 for OEM wiring work, Jun 1999 · Box 7DCASNYC-WTC_000172195
Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.
3 shared non-person entities · Same agency, volume and box · similarity 0.952
Change Order #77 for dam closures, 7 WTC, Apr 1999 · Box 7DCASNYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.947
Change Order #44 submission, Ambassador Construction, Dec 1998 · Box 7DCASNYC-WTC_000171766
Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.945
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.944
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCASNYC-WTC_000168650
Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
Change Order #105 for 7 WTC Audiovisual Work, Nov 1999 · Box 7DCASNYC-WTC_000171607
Ambassador Construction submits Change Order #105 for audiovisual expansion work at the Mayor's Office of Emergency Management.
2 shared non-person entities · Same agency, volume and box · similarity 0.943
Change order #079 for blast door plates, 7 WTC, Apr · Box 7DCASNYC-WTC_000171670
Ambassador Construction submits Change Order #079 to install reinforcing plates for blast-proof doors at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.943
Change order #077 memo for 7 World Trade Center modifications, · Box 7DCASNYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
2 shared non-person entities · Same agency, volume and box · similarity 0.943
Quote for hurricane wall enclosure at 7 WTC, Jan 1999 · Box 7DCASNYC-WTC_000171406
Quotation for furnishing and installing metal enclosure on top of the hurricane wall perimeter at 7 World Trade Center.
Same agency, volume and box · similarity 0.941
Memo summarizing Change Order #51 cost changes, Jan 1999 · Box 7DCASNYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.940
Change order #89 submission, 7 World Trade Center, June 1999 · Box 7DCASNYC-WTC_000168403
Letter submitting change order #89 for power and control wiring for the Inergen system in the fuel oil tank room.
2 shared non-person entities · Same agency, volume and box · similarity 0.939