Document / 37 pages
Final Asbestos Report, 133-135 Greenwich Street, May 2005
Machine-extracted title · confidence 100%Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
NYC-WTC_000127657–000127693Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Final Asbestos Report, 21-23 Thames Street, May 2005 · page 10 · Box DEP Box 52NYC-WTC_000127695
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similarity score 0.979 (not a probability)
Unreadable document, NYC WTC record, 26 pages · page 19 · Box DEP Box 51NYC-WTC_000126881
Multi-page document from the NYC World Trade Center environmental records collection with unreadable content.
Similarity score 0.979 (not a probability)
Fax transmission log for 75 Maiden Lane, June 2002 · page 7 · Box DEP Box 35NYC-WTC_000102276
Machine-generated fax transmission log page dated June 21, 2002, associated with the 75 Maiden Lane project file.
Similarity score 0.979 (not a probability)
Asbestos air sample TEM analysis report for 99 Church Street, · page 259 · Box DEP Box 50NYC-WTC_000124304
Laboratory report from ATC Associates providing transmission electron microscopy results for air samples collected at 99 Church Street.
Similarity score 0.979 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 80 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.978 (not a probability)
Invoice for roof cleanup at 47 Broadway, June 2002 · page 7 · Box DEP Box 47NYC-WTC_000118002
Invoice from Asbestos Removal Corp dated June 30, 2002, detailing costs for roof cleanup at 47 Broadway.
Similarity score 0.978 (not a probability)