'T&'lark^ Dep’t Citywide Administrative Services
General Design Review Comments
To: Glenn Pymento Sheet 1 of 1 A: Incorporated
Contract Number: Consultant: Consentini Ass. B:Not
Incorporated
Description: Mayor's Office Of Emergency Final Submittal
Management. explanation)
Reviewer: JOSEPH Title Mechanical Date: 5/11/98 C: Clarification
MENASCE, PE Engineer. Required
CJCMffiNT Dwg. No/ Comments
No. Spec . Pg .
The drawings are approved, as noted, pending clarification of the following
items which were not addressed satisfactorily:
________________________ Fire protection_________________________ I
1 FPl.Ol I suggest to introduce an Aqueous Film Forming Foam concentrate into the f
wet sprinkler system that would serve the fire protection for the 6000 Gal
Fuel Oil Tank and the areas where there would be a potential spill leak._____
2 FP3.23, Verify the need to provide sprinklers head in the electrical closet, room 23-
Item 2 55, adjacent to elevator shaft PE-18 and stairway, per Section 4-5.10 of
NFPA-13. This room contains a 112.5KVA transformer._________________
Xi-
Specify the alternate fire protection provided for the radio room on the roof? If
J e^S{-
4 RECEIVED^
I MAY 1 2 1996
NYC/DCAS/DRES
SPACE DESIGN & LEASING
I
I
Page 1 of 1
NYC-WTC_000167800
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000167800Source: NYC Law Department, mirrored locally
Department of Citywide Administrative Services requests specific clarifications and confirmations for itemized costs in a bid package for 7 World Trade Center.
DCAS approval of architectural and mechanical engineering services proposal for Office of Emergency Management emergency systems and equipment at 7 World Trade Center.