Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166898
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

g- Load bank disabled due to cooling failure a h. Master load switch on

i. Load step on (one for each load step)

j- Individual load bank on-off.

k. Individual generator run-off.

8. Load bank shall include control circuitry with airflow switch to shut down load bank with no air flow and interlock with generator control switchgear to shut down load bank when generator is in cool down cycle.

9. The load bank shall be a product of a firm regularly engaged in the design and manufacture of generator load banks.

10. The load bank manufacturer shall demonstrate at least five years experience with at least twenty-five successful installations of load banks similar or equal to the load bank specified herein.

11. The load bank for this application shall be by Simplex, Inc. 1139 N. MacArthur Blvd., Springfield, Illinois 62702, 800-637-8603 or other approved.

K. Load bank remote control panel enclosure shall be NEMA type I wall mounting, with hinge-open front.

L. Terminal blocks shall be provided for connection.

M. The remote panel shall duplicate all control and monitoring functions of the local system controllers as specified hereinbefore.

N. Factory Test

1. The load bank system shall be tested mounted on the generator at the factory to demonstrate compliance with Specifications. Tests shall be wimessed by the Owner and/or his representative. A certified copy of the performance test shall be submitted before shipment to the job she. Any defects which become evident during the test shall be corrected before continuing.

OEM PPS-23 Generators 7 WTC March 20, 1998

NYC-WTC_000166898

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166898Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →