Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166899
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

O. Site Tests

1, Manufacturer shall provide the services of factory trained engineer and the technicians to conduct and supervise site tests.

2. Supplier shall inspect the unit after installation. Any deficiency with the installation shall be brought to the attention of the contractor for repair or alteration. The unit shall be started up and run to determine that all systems are functional.

P. Operation and Maintenance Manuals

1. ■Rie bidder shall ftirnish six copies of operating and maintenance instructions and illustrated parts books covering the load bank and auxiliary equipment which will require operating instructions and periodic maintenance.

Q. Commissioning

1. Furnish the services of a competent, factory-trained engineer or technician to be available at the job site for period of one day for initial start-up and for instruction personnel in operation and maintenance of the equipment, on the dates requested by the Owner.

R. Equipment Warranty

1. Equipment furnished under these Specifications shall be guaranteed against defective parts and workmanship under terms of the manufacturer's and dealer’s standard warranty. But, in no event, shall it be for a period of less than two years from date of initial start-up of the system and the job site and shall include labor and travel time for necessary repairs at the job site. Running hours shall not be a limiting factor for the system warranty. During the guarantee period, the manufacturer shall respond to the emergency within less than two hours. Two hour response shall be provided for two years around the clock.

S. Alternates

1. Manufacturer shall submit value engineering alternates with cost reduction.

OEM PPS-24 Generators 7 WTC March 20, 1998

NYC-WTC_000166899

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166899Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →