NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166888
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

d. Overcrank (engine failed to start) — actual alarm.

e. Over-speed - actual alarm.

f. High jacket water temperature - actual alarm.

g- Low lube oil pressure — actual alarm.

11. An individually enclosed, D.C. operated annunciator panel which duplicates the annunciations provided at the generator control switchgear. The panel shall be mounted, on the 23rd floor in the Mechanical Room at a location where directed, and the required circuitry connection to the generator switchgear, as well as a voltage supply connection to the engine starting battery, shall be provided. The panel shall also include a silencing switch and "alarm silenced" pilot light.

12. Electronic "load sharing type" speed governor incorporating all features necessary for manual and automatic synchronizing and paralleling of the engine-generator set with other sets. The control section of the governor shall be installed in the generator control switchgear.

13. Provide alternate price for 275 gallon diesel fuel ready supply "day-tank" complete with five 2 pole float switches for 5 amps at 600 volts minimum duty and suitable connections to permit the attachment of fill, overflow return and vent piping which will be separate from the electric work. Day tank shall be U.L. labeled, and the vessel (together with electrical and fuel connections thereto) shall be suitable for operation at a working pressure of 5 psig. If the day tank is not factory installed, field installation of the day tank on, or adjacent to, the engine base will be acceptable, however, any appurtenances such as solenoid valves, etc., and connections between day tank and engine shall be provided as part of the electric work. Float switdies shall be arranged for "low alarm," "level control/lead pump", "level control/lag pump," "high alarm," and high level safety cut out" operation. Include a power supply connection from the nearest adequate 120 volt emergency source as well as circuitry extensions to solenoid valves, pump motors, etc., as required for control of fuel supply. Provide integrally mounted day tank overflow pan sized for twice the capacity of the day tank, and complete with 2-pole (alarm plus pump shutdown) float switch. Include 2-wire circuitry extension to fuel transfer tank pump, arranged to shut down transfer pump on overflow of day tank.

OEM PPS-13 Generators 7 WTC March 20, 1998

NYC-WTC_000166888

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166888Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →