I World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001
corrective action, performs the necessary agency notification and reporting, and provides a written authorization to the contractor that the site is cleaned so that field activities can proceed.
4XJ^5_J4azardousJvlaterialsjyi£^^ Contractors will manage all petroleum products and chemical materials (referred to as “hazardous materials”) in such a manner, as to minimize the potential threat to human health and the environment. Handling and storage of hazardous materials will adhere to the manufacturer’s product specific requirements. This will include secondary containment when appropriate and maintaining a safe distance from a sensitive area (e.g., storm drains and drain paths). At a minimum, hazardous materials may not be stored within 25 feet of sensitive areas. All stationary fuel tanks will have secondary containment and will be managed to prevent spills. All hazardous material containers shall have the proper labeling, as provided by the manufacturer. Contractors will adhere to World Trade Center Emergency Project Spill Prevention And Response Plan (SPRP) (Appendix F). Each contractor must submit (and update as necessary) a list of hazardous materials to the ES&H Director for all materials on site during the course of their work. In addition, contractors will maintain copies of Material Safety Data Sheets (MSDS) for all chemical compounds used on site.
4.1.1.6 Solid Waste Management (Non-Hazardous Wastes/Hazardous) Contractors will not mix World Trade Center debris with contractor-generated wastes. Further, contractors will segregate WTC rubble and light metal from structural steel prior to transporting to the approved disposal sites. Contractors are responsible for the proper management and disposal of all contractor-generated non-hazardous and hazardous wastes. Contractors may dispose of non-hazardous wastes at New York City Department of Sanitation collection points (if available) or utilize private waste management subcontractor(s). Hazardous waste will be managed in accordance with all applicable federal, state, and local regulations. Each contractor is responsible for the proper identification, containerization, labeling, storage, manifesting, transport, a nd dis posal o f a 11 ha zardous m aterials us ed a nd r egulated wastes (e.g., hazardous waste, used oil, spills to the ground) generated in the course of their activities a 11 he W TC project.
Contractors should implement waste reduction measures to minimize the generation of wastes (e.g., recycling, replacing container lids to prevent spills).
4.1.1.7 Spill Prevention and Response The World Trade Center Emergency Spill Prevention And Response Plan is provided in Appendix F. This plan discusses the proper practices for preventing a release and the appropriate response in case of a release.
4.1.1.8 Storm Water Management and Sediment Control The Storm Water Management and Sediment Control Plan is provided in Appendix G. The plan describes how storm water will be managed and sediment controlled during cleanup and recovery activities. All storm water/sediment control measures will be installed and maintained by the contractors. The storm water/sediment controls described are designed to protect surrounding waterways from sedimentation and contaminants. The contractor will inspect the sediment control measures at least every seven (7) days and within twenty-four (24) hours after
48
NYC-WTC_000164718
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
24 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
17 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
11 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
24 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
18 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
13 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
15 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
15 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153096
Interagency memo circulating EPA revisions for NESHAP and related programs with request for legal and agency comments.
14 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000124224
Letter from Brookfield requesting approval to open 1 Liberty Plaza for occupancy on October 22, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer