Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.

NYC-WTC_000164671–000164730
Page image
Scanned page image, NYC-WTC_000164717
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

f World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001

SECTION 4.0: ENVIRONMENTAL CONTROL MEASURES 4.1 GENERAL REQUIREMENTS

Cleanup and recovery activities will be performed in a manner protective of the environment. Activities will also be conducted in accordance with applicable environmental laws and regulations, and will implement generally-accepted practices. Environmental awareness training to ins truct p reject p ersonnel o n s pecific e nvironmental is sues w ill b e p art of general worker training previously discussed in Section 1.5. Adherence to the environmental control measures will be assured by periodic compliance monitoring.

4.1.1 Environmental Issues and Mitigation Measures

Potential environmental impacts on the WTC project include, or may relate to, dust, vehicle/equipment emissions, noise, unanticipated discoveries, hazardous materials management, hazardous and non-hazardous solid waste management, spills, and stormwater management and sediment control. These potential impacts are discussed further below, along with associated mitigative controls.

4.1.1.1 Dust Control Dust control is a major concern at the site. Field activities have the potential to generate and spread significant amounts of fugitive airborne dust into the surrounding residential communities and business districts. If left uncontrolled, dust may be further spread along transportation corridors to disposal sites. To control and minimize the generation and spread of dust during debris/dust removal, loading, and transport to disposal sites, contractors will follow the conditions in the World Trade Center Emergency Project Dust Protection and Suppression Plan for Post Disaster Search/Rescue, Demolition, and Cleanup (Appendix B). If asbestos is determined to be above the OSHA action level, the plan may be superseded by requirements described in Section 2.5.

4.1.1.2 Vehicle/Equipment Emissions Vehicle and equipment emissions pose a potential threat to workers and the environment. Contractors are responsible for performing regular visual vehicle and equipment inspections to ensure original equipment manufacturer’s air pollution control equipment is installed, functioning properly, and maintained.

4.1.1.3 Noise The contractors will implement noise control strategies to minimize the impact from noise for atypical events (e.g., blasting). Prior to conducting blasting or atypical noise activity, the contractor will notify DDC/Site ES&H Officer in order to provide adequate notice to local residents and businesses.

4.1.1.4 Unanticipated Discoveries If structures, containers, or discolored/odiferous soil are identified, the contractor will immediately stop work, barricade or flag the area, and then notify the EPA Emergency Response Team at (646) 756-3136 and field ES&H representative. The ES&H representative will notify DDC/DEC of the discovery. Work will resume only after the DDC/DEC investigates, takes

47

NYC-WTC_000164717

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164717Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →