NYC 9/11 Public Portal Document
Cc: "Gilsenan, Michael" <[email protected]>: "Radhakrishnan, Krish"
<[email protected]>
Sent: Monday, April 07, 2003 10:26 AM
Subject: 114 Liberty Street
> This is in response to your request to leave the polyethylene sheeting
over
> the windows in place at the completion of the Department's unoccupied
> building clean up of debris from the collapse of the WTC.
>
> It is my understanding that building representatives and the Department
> retained contractor, ETS, were in discussions regarding this matter prior
to
> addressing the request with the Department. I received the first call and
> inquiry while at home on Friday evening (April 4, 2003) while the
breakdown
> was directed to begin at 7:00 a.m. Saturday (April 5, 2003). The two
major
> issues are the late request to the Department for the change in project
> planning and the direct communication with the contractor rather than the
> Department. Also, please note the written request was received on
Saturday,
> April 5, 2003 at 9:42 A.M. The request included two original messages
dated
> Friday, April 4, 2003 at 8:35 P.M. and at 9:21 P.M. that were not
received.
> Also, the project monitor, JLC Consultants, did not receive the
information
> regarding the request.
>
> Despite the notice, the Department reviewed your request and agreed to
> permit the polyethylene sheeting to remain over the windows. The
> polyethylene sheeting installed over existing damaged in place asbestos
> -containing material in the residential spaces was left in place.
Further,
> the 1st floor commercial space (Pizzeria) was isolated from the remainder
of
> the building. The demolition of the dropped ceiling in the Pizzeria
> disclosed the presence of delaminated and damaged asbestos-containing
> material (ACM). This material had lost its cohesion properties and was
> falling off in large sections. Further, the substrate was also found to
be
> asbestos-containing material. The area was cleaned and passed a visual
> inspection by the Department prior to its isolation, however, clearance
> testing was not performed. Also, in the basement above the oil tank there
> is a partial layer of white block. The blocks were in good condition and
> therefore were not sampled nor covered.
>
> As you are aware, statement made to the Department prior to the initiation
> of the cleaning activities indicated that the building did not have in
place
2
NYC-WTC_000163131
OCR can misread numbers and units. Confirm readings against the page image before using them.