Machine-extracted title · confidence 95%Notice from the New York City Law Department instructing staff to preserve original World Trade Center documents for potential legal actions.
NYC-WTC_000138877–000138878Folder label: “2003 E-Mails Sent M Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Gilsenan, Michael From: Gilsenan, Michael Sent: Friday, January 03, 2003 8:48 AM To: Avaltroni, Robert Subject: FW: 130 Liberty Street - Manhattan
—Original Message— From: Radhakrishnan, Krish Sent: Thursday, December 26, 2002 10:48 AM To: Gilsenan, Michael; Avaltroni, Robert Subject: FW: 130 Liberty Street - Manhattan
FYI
—Original Message— From: Lutchmedial, CarlsUen Sent: Thursday, December 26, 2002 10:20 AM To: Radhakrishnan, Krish Cc: Theodorellys, Penny Subject: 130 Uberty Street - Manhattan
On Tuesday 24”^ December, 20021 conducted an inspection along with Supervisor Rasti of PAL (Asbestos Contractor) of 130 Liberty St. At this time WTC debris was still being cleaned up on various floors of the north half of the building. The 26, 24, 25, 23. 22, 21, 20 floors have been finished. Workers were about finished for the day as no work was scheduled for the Christmas Holiday. In reference to the Mold problem at the building, Rasti informed me that another crew from PAL had completely removed ail the mold from the entire building. He was not sure of what method was used. However, he said he was sure that all mold from the basement to the top floor was gone.
1
NYC-WTC_000138878
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000138882
Correspondence confirming that a draft letter regarding mold issues at 130 Liberty Street is ready for signature.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000162700
Report confirming the complete removal of mold from all floors of 130 Liberty Street following debris cleanup.
4 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154705
Report on a building inspection confirming complete removal of mold from all floors at 130 Liberty Street.
4 shared non-person entities · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161602
Memo documenting an inspection of 130 Liberty Street confirming completion of mold removal from all floors during December 2002.
4 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163165
Site observation of continuing contamination including ceiling plaster deterioration and WTC dust with notes on tenant re-occupancy hesitance.
2 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163095
Notification of completed lead wipe clearance testing at 114 Liberty with results meeting EPA clearance levels; asbestos results pending.
2 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155219
Memo regarding resident item lists and cleaning scope for 114 Liberty residents.
1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155100
Memo detailing asbestos air monitoring results, re-cleaning directives for specific floors, and damage assessment of the pizza shop ceiling.
1 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100702
Document outlining the scope for interior dust cleanup by a licensed contractor and announcing a mandatory pre-bid meeting.
2 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163162
Document referencing a status update or report regarding the 114 Liberty Street site as of July 2003.
2 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155214
Project update on completion of wall marking at 114 Liberty, noting initially missed areas and subsequent corrections.
1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000162700
Report confirming the complete removal of mold from all floors of 130 Liberty Street following debris cleanup.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154705
Report on a building inspection confirming complete removal of mold from all floors at 130 Liberty Street.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000159750
Memo reports a December 2002 inspection of mold remediation at 130 Liberty Street where debris cleanup was ongoing.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000159735
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161602
Memo documenting an inspection of 130 Liberty Street confirming completion of mold removal from all floors during December 2002.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Header page of a DEP Asbestos Inspection Report submitted by ETS Construction for the 114 Liberty Street site.
Cited alongside this record in an Ask answer
Report documenting an asbestos inspection conducted at 114 Liberty Street by ETS Construction.
Cited alongside this record in an Ask answer
NYC-WTC_000100746
Consultant billing request for additional asbestos and hazardous materials monitoring work due to project timeline extension.
Cited alongside this record in an Ask answer
NYC-WTC_000102577
Memo outlining the daily asbestos abatement and testing schedule for 114 Liberty Street from March 21 to March 26, 2003.
Cited alongside this record in an Ask answer
NYC-WTC_000102579
A fax cover sheet from ETS Contracting Inc. dated March 17, 2003, transmitting documents related to the WTC site.
Cited alongside this record in an Ask answer