NYC 9/11 Public Portal Document
WKP
LAB0RAT0RI5S, INC
AIR SAMPLE ANALYSIS REPORT
PHASE CONTRAST MICROSCOPY
CLIENT; WARREN & PANZER ENGINEERS, P.C. TURNAROUND T1M6 24HRS
WKP FILE# 501-01 sample date *24.'02
WKP LOG l.D. # N0204207, N0204208, 3'10 N020420$ RECEIVED date 4/24/02
Contract #: WTC AR2 ANALYSIS Date 4/2fiA12
REPORT DATE 1/Si»2
CLIENT JOB; NYC Department of Environmental Protection
CLIENT JOS#; 1070,01.01
LOCATION S.W. Area/ Site Map
ANALYSIS; AIRBORNE F.BER COUNTING, pHaSE CONTRAST MICROSCOPY. NIOSH 7400. NIOSH PAT Lab NO. 07186; NY
COLLECTION DEVICE; 2S mm MCE Fitter Cassette; Collection Area = 385 sq mm;
SAMPLE WERE COLLECTED BY: Benny Qlambnone, J. Garcia, and Festy Osemwegie
summary of analysis
CLIENT FIBERS/ FIBERS/
SAMPLE # Site# SAMPLE LOCATION Vol, sq mm cc
27 Gateway Plaaa Park Area 675 0.00 <0.004
1079,01.01 001
South Erid Ave, and Albany Street 67S 0.00 <0.004
002 31
West Street and Albany Place ( 675 3.80 <0.004
003 32 I
Rector Place by the Park Place 67S 0.00 <0.004
004 33A
W. Thames Street • Along Waterfront 675 0.00 <0.004
006 34
37 West o< Third Place 675 1.30 <0.004
006
West Street and Warren Street 6.40 0.004
007 e 676
4 River Terr see and Chambers Street 675 2.50 <0.004
008
009 SA River Terrace Park Area Between Park Place and Warren Street 67S 1.30 <0.004
River Terraoe and Park Place West 675 0,00 ■■ <0.004
010 9
River Terraco and Vesey 675 1.30 <0.004
oil 17
Warren Street and North End Avenue 675 0.00 <0,004
012 7
North End Avenue Park place West 675 3.80 - <0,004
013‘ 10
Trinity Place and Thames Street 675 • 0.00 <0.004
014 29
Fulton and Church Street 675 0.00 <0.004
015 21
Vesey Street and West Broadway 675 0.00 <0.004
016 2QA
Park place and Church Street 675 ,2:5'0 <0.004
017 16
12 Mutray Street and Church Street 675 3.20 <0.004
016
Park Place and Greenwich Street 675 1.30 <0.004
019 15
Murray Street and Greenwich Street 675 2i50 <0.004
020 11
021 Field Blank 0.00
022 Field Blank ■ 0.00
NOTES; 1. 5.5 fibers/100 fields was used to calculate the limit of detection (LOD). Results below the LOD have no statistical validity.
2. Samples were not collected by WKP Laboratories, Inc.
3. The Federal epa Clearance Critical following an asbestos abatement project is Q.oio fiberarcc.
4. PCM air samples will be disposed of after 3 months unless otherwise directed by client in writing.
Louis Lombardi
LABORATORY ANALYST LABORATORY DIRECTOR
NYC-WTC_000161798
OCR can misread numbers and units. Confirm readings against the page image before using them.