NYC 9/11 Public Portal Document
WKP
LABORATORIES, INC
AIR SAMPLE ANALYSIS REPORT
■■B
PHASE CONTRAST MICROSCOPY
CLIENT; WARREN & PANZER ENGINEERS. P.C. TURNAROUND TIME 24HR3
WKP FILE # S01-01 5AMPL6CIAT6 Affi'/axa
WKP LOG LD. # N0204210, N0204211,and N0204212 RECEIVED DATE *'ZS/Z004
Contract #: WTC aR2 analysis DATE <««J2002
REPORT DATE 4Z2S/2002
CLIENT JOB; NYC Department of Environmental Protection
CLIENT JOB #: 107901.01
LOCATION S.W. fifeai Site Map
ANALYSIS; AIRBORNE FIBER COUNTING, PHASE CONTRAST MICROSCOPY. NIOSH 7400. NIOSH PAT Lab NO. O71B6; NY
COLLECTION DEVICE; 25 mm MCE Filter Cassette: Collection Area = 38S sq mm;
SAMPLE WERE COLLECTED BY; Benny Glambnone. J. Garcia, and E. DIbra
SUMMARY OF ANALYSIS
CLIENT FIBERS/ FIBERS/
SAMPLE# Site# SAMPLE LOCATION Vol. sq rnm cc
1079.01.01 001 27 Gateway Plaza Park Area 675 1.30 <0.004
002 31 South End Ave. and Albany Streat 675 0.00 <0.004
003 32 West Street end Albany Race ers 5.10 <0,004
004 33A Rector Place by the Park Place 875 0.00 <0.004
005 34 W. Thames Street - Along Waterfront 67S 0.00 <0,004 ■
006 37 West of Third Place 875 0.00 <0.004
007 6 West Street and Warren Street 675 0.00 <0.004
008 4 River Terrace and Chambers Street 875 0.00 <0,004
009 SA River Terrace Park Area Sotwean Park Place and Warren Street 67S 0^00 <0.004
010 9 River Terrace and Park Place West 675 0.00 <0.004
011 17 River Terrace and Vesey ers 0.00 <0.004
012 7 Warren Street and North End Avenue 075 0.00 <0.004
013 10 North End Avenue Park place West 675 0.00 <0.004
014 29 Trinity Piece end Thamea Street 675 0.00 <0.004
015 21 Fulton and Church Street 875 3.20 <0.004
016 20A Vesey Street and West Broedwey 675 0.00 <0.004
017 18 Park place arxl Church Street 675 0.00 <0.004
018 12 Murray Street and Church Sheet 675 0.00 <0.004
019 15 Park Place and Greenwich Street 675 0.00 <0.004
020 11 Murray Street and Greenwich Street 675 1.30 <0.004
021 Field Blank 0.00
022 Field Blank 0.00
NOTES: 1. 5.5 flber$/100 fields was usee
2. Samples were not collected by WKP Laboratories, Inc.
3. The Federal EPA Clearance Critical following an asbestos abatement project is 0.010 Fibers/cc.
4. PCM air samples will be disposed of after 3 months unless otherwise directed by client in writing.
Louis Lombardi
LABORATORY ANALYST LABORATORY OIRECTCR
/
NYC-WTC_000161795
OCR can misread numbers and units. Confirm readings against the page image before using them.