NYC 9/11 Public Portal Document
w'.-ir w'W’w-HT.w-,. J- .5,
Jun 14 ’02 10:36 P.02
Training and Qualirications
• .All material handlers, supt'- T, personnel must have completed the :
otienTaiion-traini'ig program m 1'" V'Vry protection training.
» Any additional iTaming neeev<. e tasks safely.
a Al! training must be do.;: .m;er.ted. .A'!! -ecr:.; .5 must be available for revicvi.
All materia’ handlers pit ateria' Kr t-ansfeiTjd from 130 Libeny to Frc.^!.
Killi shall pos.scss qualif ations quivaler.t to thoxe requited for .vmuUr operations.
.As a best practice, the ma ten al handling sub«ntractnr shall provide personnel with
New York City and State asWstos handler ceinfieation or equivalent.
fi
Only qualified and trained operators shall be authorised to opeiau any con.struction
equipment.
Qualified and Competent Person Requirementis
■ A qualified person(s) (i.e.. FDNY) is required to oversee the collection and removal of
the WTC recovery materia! If human remains are identified prior to the rentovai of the
WTC recovery marc rial, only said qualirisd personnel shall handle the human remains,
• A competent persvftfs) (i.e., subcontractof supen ision) shall supervise the material
handling and removal operations and pro\ ide jt.ritt adherence to this protocol.
Safety Equipment
130 Liberty Street
fl FPE ■ Double disposable full body coveiaih: hard hats, safety glasses, and
respiratory protection.
fl Respiratory Protection
General .Area' Half facepiece respirator with P iO). acid gas, ciganic vapor
cartridge.s/fikers
o Areas Containing Mold - Full facepiec e respirator 'Vith P-100 filter.
a Full-body h3'Ties.s uh liir.yard attached t..« .in approved anchoidge poiti* for
employees esposed to fali hazards greate.'" iha.n 6 feet above a lower level.
Hearing protection as needed when working in close proximity to equipwent
generating noise lev els at or above the O.SH A action level and PEL.
Fresh Kilb
“ PPE - Disposal full body coveralls, hard hats, safety glas.ve$, and respiratory
protection.
■ Re.spjratory FrotecHcn - Half facepiece respirator vvitll P-100, acid gas, organic
vapor canridges/fikers.
Project Planning
• All personnel involved in the execution and implementation of this protocol shall read
and understand the contents o’" tins p-.'-'t x'oi pr.or to commencing operations within the
scope of this protocol.
■ The site emergency action plan .shall be m place and executed as needed Provisions of
the plan shall be communicated to 5” atfected parlies ______ _______________
Safety Protocols are considered a part of the WTC Emergency Project ESH Plan.
Page
NYC-WTC_000154702
OCR can misread numbers and units. Confirm readings against the page image before using them.