WTC recovery material handling memo, Jun 2002

Machine-extracted title · confidence 50%

Memo regarding the handling of World Trade Center recovery materials from 130 Liberty Street.

NYC-WTC_000154701–000154704

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154703
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document Jun 14 ’02 10:37 P.03 ?

• Representative samples ef WTC recovery material must be collected for I CLP analysis following standard VS sample collection •Tieth'"‘ds and submitted to a qualified environmental laboratDrv b> the end of shift,

Project Execution Safe Work Operations and Practices at 130 Liberty ■ All work mside 130 Liberty will be performed in accordance with safety and health I procedures established by Deutsche Bank for their building. ■ Each floor shall be handled as its own woik area ■ Work area segregation or. each n ?i?i shall utilize the construction bar.icis already in place along the North core wall The scope of this work activity shall not extend south of the North core W'alJ txiundary • Only WTC recovery material shall be lemoved from the bedding No other mater shall be handled. ■ The subcontractor shah require a Lockable storage area (approxitnarely 1 OCX.) sf> »■ stage operations, • Electrical power, including required lighting, shall be available on each work floor. » Lighting, within the woik area shall b< provided via halogen light stands, or equivalent, except withm PPE change-out areas where incandescent light strings shall be utilized, ■ All power brought into the work area shall be OFC! protected. « Waler shall be available on each floor. • Water w aste gcticrated during the opetaiicr. shaft be drummed and removed in accerdarux wnh apphe .tble requtiements. or ftkeied to 5 micrnns nnd d!*^charged into nearby sanitary sewer*., ’ Where required, all polyethylene, w-ood. and othei matenal? used on the project shall be fire retardant. • The East-West barrier, along the North side of the core shall be completed, where required, to prevent the potential .spread of recovery material into the South side of the building. ■ z\n elevator shall be designated for use to transport bagged recovery material to the uanspon contaiaers. The elevator Arid the path to the elevator shall be plasticized. f ■ In the event of power failure or other unfote-Aeeablc circumstance'- the use of a crane I

wAskip pan for unloading material shaft be available. • All WTC recoveiy material within weik areas shaft misted with water during j handling to minimize the generation of du.st " Large obstructions on the f.c-ors shaft be me ed to an area to allow access for the. I I '! recovery matcnal removal * Recovery material shaft be collected and pJa.ted into clear polyethylene bag.s and I double bagged prior to transport to collection containers. ■ Bags shall be labeled v ;ih the appropna’e floor numbers for identification " AU PPE used during the operation shaft be hur.dled as conventjnnal waste. % • Each work area shall be cleared of all visible recovery material only. r.-'

® Sampling of the workers and work envuonment will be toutinely conducted to insure

1 worker safety • FDNY personnel shall declare areas complete after final acceptance

Safety Protocols are considered a part of the WtC Emergency Project ESH Plan. J Page 3

NYC-WTC_000154703

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154703Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →