• Representative samples ef WTC recovery material must be collected for I CLP analysis
following standard VS sample collection •Tieth'"‘ds and submitted to a qualified
environmental laboratDrv b> the end of shift,
Project Execution
Safe Work Operations and Practices at 130 Liberty
■ All work mside 130 Liberty will be performed in accordance with safety and health I
procedures established by Deutsche Bank for their building.
■ Each floor shall be handled as its own woik area
■ Work area segregation or. each n ?i?i shall utilize the construction bar.icis already in
place along the North core wall The scope of this work activity shall not extend south
of the North core W'alJ txiundary
• Only WTC recovery material shall be lemoved from the bedding No other mater
shall be handled.
■ The subcontractor shah require a Lockable storage area (approxitnarely 1 OCX.) sf> »■
stage operations,
• Electrical power, including required lighting, shall be available on each work floor.
» Lighting, within the woik area shall b< provided via halogen light stands, or equivalent,
except withm PPE change-out areas where incandescent light strings shall be utilized,
■ All power brought into the work area shall be OFC! protected.
« Waler shall be available on each floor.
• Water w aste gcticrated during the opetaiicr. shaft be drummed and removed in
accerdarux wnh apphe .tble requtiements. or ftkeied to 5 micrnns nnd d!*^charged into
nearby sanitary sewer*.,
’ Where required, all polyethylene, w-ood. and othei matenal? used on the project shall
be fire retardant.
• The East-West barrier, along the North side of the core shall be completed, where
required, to prevent the potential .spread of recovery material into the South side of the
building.
■ z\n elevator shall be designated for use to transport bagged recovery material to the
uanspon contaiaers. The elevator Arid the path to the elevator shall be plasticized.
f
■ In the event of power failure or other unfote-Aeeablc circumstance'- the use of a crane I
wAskip pan for unloading material shaft be available.
• All WTC recoveiy material within weik areas shaft misted with water during
j
handling to minimize the generation of du.st
" Large obstructions on the f.c-ors shaft be me ed to an area to allow access for the. I
I
'!
recovery matcnal removal
* Recovery material shaft be collected and pJa.ted into clear polyethylene bag.s and I
double bagged prior to transport to collection containers.
■ Bags shall be labeled v ;ih the appropna’e floor numbers for identification
" AU PPE used during the operation shaft be hur.dled as conventjnnal waste. %
• Each work area shall be cleared of all visible recovery material only. r.-'
® Sampling of the workers and work envuonment will be toutinely conducted to insure
1
worker safety
• FDNY personnel shall declare areas complete after final acceptance
Safety Protocols are considered a part of the WtC Emergency Project ESH Plan.