NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 42/E-mails R. Avaltroni 2002
Document / 5 pages

WTC debris handling memo from Liberty Street, June 2002

Machine-extracted title · confidence 94%

Memo regarding the handling of World Trade Center debris originating from 130 Liberty Street for environmental health compliance.

NYC-WTC_000161212–000161216

Folder label: “E-mails R. Avaltroni 2002”

Page image
Scanned page image, NYC-WTC_000161215
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• Representative samples of WTC recovery material must be collected for TCLP analysis following standard US EPA sample collection methods and submitted to a qualified environmental laboratory by the end of shift.

Project Execution Safe Work Operations and Practices at l30 Liberty ■ All work inside 130 Liberty will be performed in accordance with safety and health procedures established by Deutsche Bank for their buildings ■ Each floor shall be handled as its own work area. ■ Work area segregation on each floor shall utilize the construction barriers already in place along the North core wall. The scope of this work activity shall not extend south of the North core wall boundary. " Only WTC recovery material shall be removed from the building. No other materials shall behandled. ■ The subcontractor shall require a lockable storage area (approximately I ,(XM) sf) to stage operations. ■ Electrical power, including required lighting, shall be available on each work floor. ■ Lighting within the work area shtdi be provided vjahalogen light stands, or equivalent, except within PPE change-out areas where incandescent light strings shall be utilized. ■ All power brought into the work area shall be GFCI protected. ■ Water shall be available on each floor. ■ Water waste generated during the operation shall be drummed and removed in accordance with applicable requirements, or filtered to 5 microns and discharged into nearby sanitary sewers. ■ Where required, all polyethylene, wood, and other materials used on the project shall be fire retardant. ■ The East-West barrier, along the North side of the core shajl be completed, where required, to prevent the potential spread of recovery material into the South side of the building. ■ An elevator shall be designated for use to transport bagged recovery material to the transport containers. The elevator and the path to the elevator shdl be plasticized. ■ In the event of power failure or other unforeseeable circumstances, the use of a crane w/skip pan for unloading material shall be available. ■ All WTG recovery material within work areas shall be misted with water during handling to minimize the generation of dust. • Large obstructions on the floors shall be moved to an area to allow access for the recovery material removal. ■ Recovery material shall be collected and placed into clear polyethylene bags and doable bagged prior to transport to collection containers. ■ Bags shall be labeled with the appropriate floor numbers for identification. » All PPE used during the operation shall be handled as conventional waste. ■ Each work area shall be cleared of all visible recovery material only. ■ Sampling of the workers and work environment will be routinely conducted to insure worker safety. • FDNY personnel shall declare areas complete after final acceptance.

Safety Protocols are considered a part of die WTC Emergency Project ESH Plan,

Pages

NYC-WTC_000161215

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000161215Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000152327 · Box DEP Box 26

A financial document from late September 2001 related to water supply operations and emergency response costs.

Cited alongside this record in an Ask answer

NYC-WTC_000154518 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

Compare copies and versions →