Safe Work Operations and Practices at Fresh Kills
In addition to standard operating procedures for the handling of WTC recovery material, the
following additional requirements will be implemented to address concerns of Deutsche Bank;
■ WTC recovery material prepared for FT)NY search shall be on nonporous tarps.
■ WTC recovery materials will be sifted using equipment at the landfill.
■ After sifting, the materials from 130 Liberty will be segregated and protected from
weather until it can be repackaged in a manner consistent with how it was shipped to
fresh kills.
■ Materials will be repackaged in a manner consistent with how it was removed from
ISOUberty.
■ Packaged material will be immediately loaded on a truck provided by Deutsche Bank
and removed from the landfill.
■ Deutsche Bank will relocate the material to a Class 1 hazardous waste facility of its
choosing.
Safety Protocols are considered a part of the WTC Emergency Project ESH Plan.
Page 4
NYC-WTC_000162386
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000162386Source: NYC Law Department, mirrored locally
Memo describing the scope of work for searching and handling World Trade Center recovery materials at 130 Liberty Street following human remains discovery.
Memo describing the scope of work for searching and handling World Trade Center recovery materials at 130 Liberty Street following human remains discovery.
Memo describing the scope of work for searching and handling World Trade Center recovery materials at 130 Liberty Street following human remains discovery.
Memo describing the scope of work for searching and handling World Trade Center recovery materials at 130 Liberty Street following human remains discovery.
Memo describing the scope of work for searching and handling World Trade Center recovery materials at 130 Liberty Street following human remains discovery.