NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails 2002 M. Gilsenan
Document / 5 pages

WTC material handling at 130 Liberty Street, June 14, 2002

Machine-extracted title · confidence 95%

Correspondence regarding the handling of World Trade Center materials originating from 130 Liberty Street.

NYC-WTC_000162382–000162386

Folder label: “E-mails 2002 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000162384
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Training and Qualifications ■ All material handlers, supervision, and support personnel must have completed the site orientation-training program including respiratory protection training. • Any additional training necessary to complete tasks safely. ■ All training must be documented. All records must be available for review. ■ All material handlers preparing material to be transferred from 130 Liberty to Fresh Kills shall possess qualifications equivalent to those required for similar operations. As a best practice, the material handling subcontractor shall provide personnel with New York City and State asbestos handler certification or equivalent. • Only qualified and trained operators shall be authorized to operate any construction equipment.

Qualified and Competent Person Requirements ■ A qualified person(s) (i.e., FDNY) is required to oversee the collection and removal of the WTC recovery material. If human remains are identified prior to the removal of the WTC recovery material, only said qualified personnel shall handle the human remains. ■ A competent person(s) (i.e., subcontractor supervision) shall supervise the material handling and removal operations and provide strict adherence to this protocol.

Safety Equipment 130 Liberty Street ■ PPE - Double disposable full body coveralls; hard hats, safety glasses, and respiratory protection. ■ Respiratory Protection - o General Area - Half facepiece respirator with P-100, acid gas, organic vapor carlridges/fi Iters. o Areas Containing Mold - Full facepiece respirator with P-IOO filter. ■ Full-body harness with lanyard attached to an approved anchorage point for employees exposed to fall hazards greater than 6 feet above a lower level. ■ Hearing protection as needed when working in close proximity to equipment generating noise levels at or above the OSHA action level and PEL.

Fresh Kills ■ PPE - Disposal full body coveralls; hard hats, safety glasses, and respiratory protection. ■ Respiratory Protection - Half facepiece respirator with P-lOO, acid gas, organic vapor cartridges/filters.

Project Planning • All personnel involved in the execution and implementation of this protocol shall read and understand the contents of this protocol prior to commencing operations within the scope of this protocol. ■ The site emergency action plan shall be in place and executed as needed. Provisions of the plan shall be communicated to all affected parties._____________________ _ Safety Protocols are considered a part of the WTC Emergency Project ESH Plan.

Page 2

NYC-WTC_000162384

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000162384Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154518 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

NYC-WTC_000154538 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

Compare copies and versions →