• DEP has inspected 1,073 buildings in and around lower Manhattan. The
following are the results of these inspections:
Buildings without debris on exterior surfaces 750
Buildings with exterior debris 323
Buildings cleaned by building owners and
re-inspected by DEP 102
Buildings cleaned by DEP contractors 221
Unoccupied Building Clean Up Program
• DEP’s Unoccupied Building Clean Up Program was developed with funding from
the Federal Emergency Management Agency to clean up unoccupied buildings
that still had WTC debris. Two buildings, 125 Cedar Street and 114 Liberty
Street, were identified. DEP staff developed scopes of work for the clean up and
air monitoring. The scopes of work were given to the building owners and the
tenants.
• Several inspections with tenants and owners were conducted by DEP to hear the
concerns of all involved and ultimately to explain the Scopes of Work with each
tenant / owner concerning their individual apartments.
• Two licensed asbestos abatement contractors (one for each building) were chosen
through the City’s procurement process to conduct the cleaning of building under
DEP’s direction and oversight. Two third party air-monitoring firms were also
chosen through the City’s procurement process to perform bulk, wipe and air
sampling. Samplings were conducted prior, during, and post clean up activities.
• Both DEP and EPA reviewed the sampling results. Samplings were repeated
when the results did not meet the clearance criteria. The buildings were handed
over to the building owners / tenants after satisfactory results were obtained from
the sampling.
Residential Clean up Program
• Assisted in the development of a Scope of Work for the establishment of an EPA
Hotline
• Acted as the procurement entity for the EPA Hotline
• Developed estimates to secure FEMA funding
• Developed draft Scopes of Work for EPA
• Coordinated the final Scopes of Work with EPA after many discussions with local
elected officials, local organizations and scientists.
• Developed contractor criteria for the procurement process
• Coordinated efforts between Corporation Counsel, DEP’s and EPA’s Legal
Departments to secure access agreements and insurance requirements.