100 Greenwich Street
Machine-extracted address · confidence 0.15 · verify source page
Building details
- Year built
- 2015
- Floors
- 25
- Units
- — residential / 192 total
- Building area
- 70,918 sq ft
- Building class
- hotel (H2)
- Buildings on lot
- 1
Present-day data · provided by prospect.nyc. These figures describe the lot today, not in 2001 — building facts only, never owner names, unit lists or sales.
Activity by month
| Month | Pages |
|---|---|
| Sep 2001 | 2 |
Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
No test candidates in this selection.
Documents for this building
4 documents across 3 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Memo or letter · 1
Memo recommending permanent barriers at Ground Zero before moving the safe site perimeter closer to the disaster zone.
11 pages · 2001-09-23 · Environmental Protection, Dept. of · Box DEP Box 26 · matched page 3Permit application · 2
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
120 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 10 · folder “DEP - BEC ACTIVITIES WTC” · matched page 67DEP asbestos project notification form and inspection report dated December 12, 2002.
104 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 10 · folder “ASBESTOS” · matched page 83Form · 1
Log of air testing and flyer distribution activities at multiple downtown buildings following the September 11 attacks.
7 pages · 2001-09-23 · Environmental Protection, Dept. of · Box DEP Box 31 · folder “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Ch…” · matched page 1Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.