NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
Building map/ Building file
Building / all boxes

100 Greenwich Street

Machine-extracted address · confidence 0.15 · verify source page

See on map →
4 records7 source pages0 test candidate pages2001-09-232001-09-23Machine-extracted date span · verify dated source rows

Building details

Year built
2015
Floors
25
Units
residential / 192 total
Building area
70,918 sq ft
Building class
hotel (H2)
Buildings on lot
1

Present-day data · provided by prospect.nyc. These figures describe the lot today, not in 2001 — building facts only, never owner names, unit lists or sales.

Activity by month

Distinct page counts by extracted month, not measurements.
Source pages by extracted month
MonthPages
Sep 20012

Samples, readings and decisions over time

Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.

No test candidates in this selection.

Documents for this building

4 documents across 3 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.

Memo or letter · 1

Memo re: WTC site perimeter safety, Oct 2001NYC-WTC_000153138

Memo recommending permanent barriers at Ground Zero before moving the safe site perimeter closer to the disaster zone.

11 pages · 2001-09-23 · Environmental Protection, Dept. of · Box DEP Box 26 · matched page 3

Permit application · 2

DEP activities memo regarding WTC cleanup coordination, undatedNYC-WTC_000148621

Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.

120 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 10 · folder “DEP - BEC ACTIVITIES WTC” · matched page 67
Asbestos Project Notification and Inspection Report, Dec 2002NYC-WTC_000149432

DEP asbestos project notification form and inspection report dated December 12, 2002.

104 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 10 · folder “ASBESTOS” · matched page 83

Form · 1

Air monitoring and flyer distribution log, Sept-Oct 2001NYC-WTC_000154558

Log of air testing and flyer distribution activities at multiple downtown buildings following the September 11 attacks.

7 pages · 2001-09-23 · Environmental Protection, Dept. of · Box DEP Box 31 · folder “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Ch…” · matched page 1

Related buildings on the same block

Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.

No same-block matches established by this place’s block-lot key or present-day footprint join.