09/22/01 Buildings Visited on Broadway
196 Building was locked and information flyer was inserted through the
shutter
198 Met maintenance worker Al Myrie and gave the information flyer
200 M Odells Sporting - Locked and flyer was inserted
202 Portabella Garments- Information flyer given to a worker
204 Locked- Information flyer inserted
150 Fulton Street- Mrs Field -restaurent -workers washing counters, information
flyer given to the manager.
195 Front facade washing was ongoing. Information flyer was given to the
Director of facility, who doesn’t know the details of any ACM clean-up and
said will inform the individual who handles Asbestos projects for the
building.
191 Church- Information flyer was given to father, who claimed that someone
was working on arranging the contractor. Air monitoring was advised.
222 Pinnacle Environmental already completed a major clean-up in various floors
and air montoring results were requested. Spoke to the Engineer Jim
Tinesky. The clean-up was started on 9/13/01.
217 As per Property Manager Scott Lavloi;bulk sampling was collected on lO”*
and 8'*’ floor roofs and 2% ACM detected on the 10“* floor. AA Services was
performing the clean-up on the IO*** floor roof. Air results requested.
225 Tony Velez, Assistant Super- Information flyer was given
233 Woolworth Building- Vincent Baffa, Building Manager- Air samples collected
several occasions after the WTC attack and no positive readings found.
Recently samples collected last night and results were un known. Sampled
locations -lobby, 9“’, 14*** floors. Information flyer was given to Mr. Baffa and
air sampling was requested.
250 John Migee, Building Engineer- Air sampling was conducted couple of days
_____ ago and clearance levels were met. Building Owners .Amtrust (9171939-2504. _
Information flyer was given and air results requested.