• The key components of the comprehensive plan to be instituted on 6/3/02 are as follows:
Short term
- EPA is lead Agency
- Establishment of an EPA hotline
- Direct assistance to residents and residential building owners (clean-up and testing of
apartments, as requested
- Cleaning of unoccupied, uncleaned buildings. Six (6) as of this writing
- Clean-up of exterior buildings with residual WTC debris
- Professional review of HVAC systems as requested
- Distribution upon request, of HEPA Vacs through FEMA
Long term
- Pilot building cleaning to assess cleaning techniques
- Create a database on private sector environmental testing results and clean-up activity
- Background study of levels of potential contaminants
• DEP developed Scopes of Work for the hotline and clean-up activities, in conjunction with EPA,
and is in the process of procuring the contracts to be managed by EPA.
• DEP will be setting up meetings with local elected officials and groups prior to the
commencement of the program. These meetings will be led by EPA.
• A major symposium is being set up by DEP to be held at Pace University prior to the
commencement of the program. This symposium will be led by EPA.
NYC-WTC_000148675
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000148675Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Departmental feedback on a draft contract scope of work, addressing trigger mechanisms, clearance levels, supervision requirements, and legal terminology.
Document detailing short-term actions like hotlines and cleaning, alongside long-term strategies including pilot programs and contaminant background studies.
Statistical summary of asbestos testing submitted by building owners, including counts of bulk samples, air monitoring results, and inspection outcomes.
Document detailing short-term actions like hotlines and cleaning, alongside long-term strategies including pilot programs and contaminant background studies.
Daily activity report detailing updated identification requirements for DEP employees and contractors entering the Red Zone at the World Trade Center site.