The completion of this monumental project is at hand and DEP and its partners
are in a position to return $70 million to the City.fThe return of these monies is no small
feat and is being done in conjunction with FEMA. DEP was able to push its partners and
the contractors to finish the project one year ahead of schedule. The Scopes of Work
developed for this project were precise allowing no room for waste, Contract Change
Orders were handled with an eye towards fiscal responsibility. Senior management
meetings were constantly held to ensure continued progress was made and to identify and
correct problems before they materialized. Innovative measures were used to speed up
the public’s response to the program resulting in fewer delays. These actions were all
instituted without compromising the integrity of the overall mission to reassure the public
that Lower Manhattan was, and is, a safe area to work and live.
I have included the highlights of each program dating back to May of last year
when our Administration became involved in a project that was going nowhere. Today,
we can take great pride in the accomplishments of this effort.
Exterior Building Clean-Up Program
• DEP performed inspections of exterior building surfaces, including the
examination of roofs, facades, alleys, fire escapes and ledges for the presence of
visible debris from the collapse of the World Trade Center (WTC). Buildings
with visible accumulations of debris were identified, and building owners and
managers were directed to have the material tested and cleaned appropriately.
Follow-up inspections were performed based on owner/manager written response.
• DEP’s Exterior Clean Up Program was developed with funding from the Federal
Emergency Management Agency to clean up exterior surfaces of buildings that
still had WTC debris. DEP staff developed scopes of work for the clean up and
air monitoring. The Exterior Clean Up Program was initiated on June 3,2002.
• Three abatement contractors, chosen through the City’s procurement process,
conducted the exterior cleaning of building surfaces under DEP’s direction and
oversight. A third party air-monitoring firm, also chosen through the City’s
procurement process, who performed air sampling during clean-up activities. The
clean-up work included installing barriers, collecting all bulk debris, HEPA
vacuuming and wet wiping surfaces, and a final wash down of the included
surfaces. Water collection barriers are set up when necessary. Collected water
was filtered.
• DEP contractors completed work removing potentially hazardous dust and debris
that accumulated on the roofs, windows and facades of downtown buildings
following the World Trade Center collapse. DEP contractors cleaned the surfaces
of 221 building, or more than 3.6 million square feet of exterior building space,
during the 10-month long project.