NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146419
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document * £ Be ete ae! cantina BH wee boa bs L cde RCh Gace keke oer ee te wes a ee eke nate PF ee ek ee wo ia i « an NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION . 59-17 Junction Boulevard, 8 sbeebs 11368-5107 U 2) 4 53 Mul we nN ASBESTOS PROJECT NOTIFICATION Duable (ASBESTOS INSPECTION REPORT) 1. ec Ce 7 (See foe schedule) % When submitting this form at the NYC Department of Buildings, pe acy ecb Rapa bs os signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . i. FACILITY 2. Address GROUND ZERO - West St. between Liberty & Vesey Streets Borough Manhattan jy 10048 AKA BS level North of South Projection 3. Block 58 4.tot 1 5. Type of Facility 6. Name of Building West Slurry Wall proximate to West St. 8. BUILDING OWNER = Se 7. Name New York City Department of Design and Construction 8. Contact Person Bob Adams 9. Tel. ee Fax # 10. Address 30-30 Thomson Avenue City New York State NY Zip iil. GENERAL CONTRACTOR 11. Name. Tel. # iV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Safeway Environmental Corp. 13. Contact Person Don Adler 14. Feder! Employer A +s rf =§s 16. Address 1379 Commerce Avenue City Bronx State NY zip _10461 “VE THIRD PARTY AIR MONITOR Person Fred Burkhardt 17. Name ATC Associates << ii — £ 21. Address 104 East 25th Street City New York State NY Zip 10010 23. NYS DOH ELAP # 10879 22. Sample Analysis Laboratory ATC Associates VL PROJECT INFORMATION 24. Starling date for this portion of work 3/21/02 Projected completion date 4/21/02 Asbestos work schedule [2] Monday [2] Tuesday BJ wednesday WZ] thursday W] Friday El satuey Fl Sunday Shiftfrom: 7 2] am 0 pm to? 2) am C] pm ae Project is being run 24hours/day - 7 days/week . Access fo inspect the premises must be provided during the work schedule indicated in this tem. 25. Total amount of asbestos-containing material to be abated during this work _____5,000 Square Feet, and/or Linear Feet NYC-WTC_000146419

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146419Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →