NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146295
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document - EMERGENCY eI /0) NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION S Asbestos Controi Program | 59-17 Junction Boulevard, 8” Floor, Corona. NY 11368-5107 FOR OFFIGAL USE ONLY. ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1. $1200 (See fee schedule) isiform at the NYC Department of Buildings, the original form and three (3) copies with original ed. Submittal at the NYCDEP requires one copy of the form with original signatures. This Z ted to the NYC DEP not less than one week in advance of the start of abatement activities . , I. FACILITY 2. Address 115 Broadway & Borough Manhattan Zip _ 10006 AKA 3. Block 59 4.Lot _1 5. Type of Facility Office Building 6. Name of Building Il. BUILDING OWNER 7. Name Capital Properties 8. Contact Person Kevin Hoey 40. Address 111 Broadway City New York State NY Zip 10006 It. GENERAL CONTRACTOR 41. Name V & M Restoration, Inc. ro iV. ASBESTOS ABATEMENT CONTRACTOR 12. Name MARCOR Remediation, Inc. 43. Contact Person Jason Deprez 14. Federal Employer ID. 146. Address 92 Marway Circle [la 15. Tel. ht i City Rochester State NY Zip 14624 V. THIRD PARTY AIR MONITOR 17. Name Tiger Environmental 18. Contact Person Femando Villa 19. Federal Employer ID. 21. Address 133 Northwood Ave city Linden Zip 07036 State NJ 22. Sampie Analysis Laboratory. EMSL 23. NYS DOH ELAP # 11469 Vi. PROJECT INFORMATION 24, Starting date for this portion of work 11/12/01 Projected completion date 12/12/01 Asbestos work schedule Monday Tuesday Wednesday Thursday Friday O Saturday O Sunday Shift from: 8 am CJ pm to 430 If other, specify DO am pm Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 7,000 Square Feet, and/or NYC-WTC_000146295 0 Linear Feet

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146295Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →