NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
110 1. $1200 (See flle achedule)
.. ---.---------------;+-~BoroughManhattan Zip 10007 •.. AKA 3. Block 88 -------------------~ ----- 4. Lot -1- - - - __at,,;;,,__ _ _ _ _ _ _ _ 6. Name of Building _ _ _ _ _ _ _ _ _ _ _ _ __ 5. Typeof FacllftY._Co_m_merci
11. BUILDING OWNER
9. Tel.# ~===;;:::..__.:.... ___ Fax ---------- 8. Contact Person J. DIMurro
10. Address 217 Broadway City New York
llL GENERAL CONTRACTOR 11. Narne._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Tel.# _ _ _ _ _ _ _ _ __
IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name AA SERVICES, LLC 13. Contact Person J. RENSINK ---------- 14. Federal Employer I D . - - 15. Tel. _ _ Fax- 16. Address 36 EAGLE S1REET City MONROE State~ Zip 10950
V. THIRD PARTY AIR MONITOR 17. NameA.E.C.C. 18. Contact Person Anthony Nowicki Jr. 19. Federa-IEm-ploye--r-ID------===------20-.-~-el-.----.__---- . Fax _ _ __
21 .Address 1302WalnutAvenue City Bohemia State~Zlp 11716
22. Sample Analysts Laboratory,_Scle __ ntifl_·_c_Laboratories~--· _ _ _ _ _ _ _ _ _ 23. NYS DOH ELAP #_1_1480 _ _ _ __
VI. PROJECT INFORMATION 24. Star11ng date for this portion of work _9_"2.5/0 __ 1 _ __ Projected completion date _ _9/30/0 _ 1 _ __
Asbestos work schedule D Monday 121 Tuesday 121 Wednesday 121 Thursday 121 Friday 121 Saturday 121 Sunday Shift from: _7_ _ fa am D pm to _7_ _ Dam~ pm If other. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ specify
I Access'° Inspect the premises must be provided during the wodc schedule Indicated In this Item.
25. Total amount of asbestos-containing material to be abated during this work 'lr-c.oo "" ·· 1 Square Feet. and/or o Linear Feet
NYC-WTC_000146271
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000154727
Application form submitted to DEP for an asbestos inspection or abatement project at 100 Church Street.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000109630
Project notification form for asbestos abatement activities submitted to the NYC Department of Environmental Protection.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115929
Form header for an Asbestos Project Notification regarding inspection at a location.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102470
Invoice from Asbestos Removal Corp detailing costs for cleaning debris from the roof of 90 Maiden Lane in June 2002.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
Similarity score 0.960 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer