NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146257
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document > > « * EI Asbestos Control NYC:DEPARTMENT OF ENVIRONMENTAL PROTECTION Program 59-17 Junction Boulevard, 8” Floor, Corona, NY 11368-5107 Y ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) Nese (See fee schedule) When submitting this forth at the NYC Department of Buildings, the original form and three (3) copies with signatures are req at the NYCDEP requires one copy of the form with original alanine | form must lo the NYC: EP not less than one week in advance of the start of abatement . "D. Address_140W West Street New Yoprk, NY 4 __ aKa Verizon 5. Type of Facility Commercial ll. BUILDING OWNER 7. Name Verizon Borough Manhattan | ~ Zip 10007 Bee | 3. Block 2109 6. Name of Bullding Verizon city Union 4.Lot _40 8. Contact Person Nick Perefetto 10. Address 1095 6th. Ave Clty Manhattan State NY Zip 10033 a GENERAL CONTRACTOR \ 11, Name N/A Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR ¢ 42. Name Comprehensive Environmental! Service, inc 13. Contact Person John Tardy | 14. Federal Employer ID 15. Tel. # Fax a, £i— 16. Address 365 River Drive . city Garfield state NJ___ zip 07026 v. THIRD PARTY AIR MONITOR 17. Name Hillaman Environmental 418. Contact Person J0e Hillman 19. Federal Employer {D , i 20. Tel. # i W CW 21. Address 1600 Route 22 East 22. Sample Analysis Laboratory TESTOR TECHNOLOGY Vl. PROJECT INFORMATION State NJ 24, Starting date for this portion of work 9/18/01 Asbestos work schedule Zip 07083 23. NYS DOH ELAP # 11537 Projected completion date 12/31/01 Shift from 12:00 Mam 01 pm to 5:00 If other Ea Monday J Tuesday iX | Wednesday [4 ea Thursday Ca Friday Ca Saturday i] Sunday am pm specify _- Access to inspect the premises must be provided during the work schedule indicated in this item 25. Total amount of asbestos-containing material to be abated during this work 950,008 Square Feet, and/or 0 Linear Feet NYC-WTC_000146257

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146257Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →