NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Standard Operating Procedure Page 2 of 10 Lockout/ Tagout 1/00 Edition
1.0 PURPOSE
WRS recognizes the hazards of imexpected:
energization machine startup and/or release of stored energy
during service or maintenance activities on equipment/machines. The following Standard Operating Procedure: Control of Hazardous Energy - Lockout/Tagout, has been developed to provide for the isolation of all energy sources that could endanger employees.
This procedure establishes minimum requirements for the lockout and/or tagout of energy isolating devices and systems. Lockout and/or tagout shall be used to ensure that all equipment, machinery, systems and facilities are inoperable and isolated from all potentially hazardous energy. The Lockout/Tagout procedure shall be implemented before employees perform service or maintenance activities where the unexpected energization, start-up or release of stored energy could cause personal injury and/or damage to equipment, machinery, facilities or the environment.
2.0 SCOPE
A. Provisions outlined in this SOP include individual responsibilities, instructions for the implementation and removal of energy control procedures and employee training requirements.
B. Employees Covered - This procedure applies to all WRS employees and sub-contractors to the same.
C. Activities Covered
.'SEdee and maintenance activities on machines, equipment, systems and facilities during which the unexpected energization, start-up or release of stored energy could cause injury to employees must be conducted under the protection of a Lockout/Tagout SOP.
OperationZProduction activities during which an employee must remove or bypass a guard or other safety device, or place his/her body into an area of machinery/equipment where work is actually performed upon the material being processed (point of operation) must also be conducted in accordance with a Lockout/Tagout SOP.
D. This SOP is generic in nature and applies to the portion of scenarios described above which meet the following criteria:
1. The machine, equipment or facility component has no potential for stored or residual energy or re-accumulation of stored energy after shut down which could endanger employees;
2. The machine, equipment or facility component has a single energy source which can be readily identified and isolated;
3. The isolation and locking out of that energy source will completely de-energize and deactivate the machine, equipment or facility component;
4. The machine, equipment or facility component is isolated from that energy source and locked out during servicing, maintenance or site operations;
fi'XS Infrastructure & Environment, Inc.
NYC-WTC_000145124
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer