NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
17 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
NYC-WTC_000104853–000104885Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
J. ELECTRICAL SYSTEMS LOCKOUT AND TEMPORARY POWER IMPLEMENTATION
• The use of wet methods increases the potential for electrical shock when working around electrical panels, conduit, light fixtures, alarm systems, junction boxes, computers, transformers, etc.
• De-energize as much equipment as possible. Use portable flood-light systems for lighting and regularly check the system and wiring for damage. Twelve volt lights systems are available that work very well.
• Consider using dry removal in areas immediately adjacent to energized electrical equipment if de-energizing is not feasible. Consultation with local NESHAP to authorities is necessary prevent citation for failure to use wet methods.
• Use non-conductive scrapers and vacuum attachments (wood, plastic, rubber).
• Supply workers with heavy insulated rubber boots and /or gloves when working around energized wiring or equipment (lighting, panel boxes, transformers).
•• Ensure all electrical equipment in use is properly grounded before the job starts. This means checking outlets, wiring, extension cords and power pickups. Check for the ground-pin on plugs. These checks should also be made while setting up and regularly during the job.
• Use care not to violate insulated coverings with scrapers, scaffolding wheels, etc. Rolling a heavy cart of scaffold over a flex cord can easily cause internal damage.
• Avoid stringing electrical wiring across floors. Elevate wiring if possible to keep it away from water on the floor and damage from foot traffic and rolling scaffolds. Duct tape is effective for this.
• Do not allow water to accumulate in puddles on work area floors. NESHAP regulations require damp conditions, not standing water!
• Ensure electrical outlets are tightly sealed and taped to avoid water spray.
• Always perform a pre-work walk-through to identify potential sources of electrical hazards to abatement workers, or equipment that may be damaged by wet removal methods.
• Use stable wooden or fiberglass ladders not metal.
• Determine operating voltages of equipment and lines before working on or near energized parts. De-energize and lock-out when possible.
NYC-WTC 000104875
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
17 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
10 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
11 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
14 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135560
Application for permits regarding exterior remediation work at World Trade Center vicinity buildings.
6 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
9 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
13 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107379
Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Review draft of an environmental health and safety plan for debris operations at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000150256
Table of contents for a site control plan document regarding landfill entry and exclusion zones for WTC debris.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer