J. ELECTRICAL SYSTEMS LOCKOUT
AND TEMPORARY POWER
IMPLEMENTATION
• The use of wet methods increases the potential
for electrical shock when working
around electrical panels, conduit, light fixtures, alarm
systems, junction boxes,
computers, transformers, etc.
• De-energize as much equipment as possible.
Use portable flood-light systems for
lighting and regularly check the system and wiring
for damage. Twelve volt lights
systems are available that work very well.
• Consider using dry removal in areas immediately
adjacent to energized electrical
equipment if dc-energizing is not feasible. Consultation
with local NESHAP
to
authorities is necessary prevent citation for failure to
use wet methods.
• Use non-conductive scrapers and vacuum
attachments (wood, plastic, rubber).
• Supply workers with heavy insulated rubber
boots and /or gloves when working
around energized wiring or equipment (lighting, panel
boxes, transformers).
• Ensure all electrical equipment in use is
properly grounded before the job starts. This
means checking outlets, wiring, extension cords and
power pickups. Check for the
ground-pin on plugs. These checks should also be
made while setting up and
regularly during the job.
• Use care not to violate insulated coverings with
scrapers, scaffolding wheels, etc.
Rolling a heavy cart of scaffold over a flex cord can
easily cause internal damage.
• Avoid stringing electrical wiring across floors.
Elevate wiring if possible to keep it
away from water on the floor and damage from
foot traffic and rolling scaffolds.
Duct tape is effective for this.
• Do not allow water to accumulate in puddles on
work area floors. NESHAP
regulations require damp conditions, not standing water!
• Ensure electrical outlets are tightly sealed and
taped to avoid water spray.
• Always perform a pre-work walk-through to
identify potential sources of electrical
hazards to abatement workers, or equipment that may be
damaged by wet removal
methods.
• Use stable wooden or fiberglass ladders not metal.
• Determine operating voltages of equipment and
lines before working on or near
energized parts. De-energize and lock-out when possible.