December 17, 2002 114 LIBERTY STREET
REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
3.04 ELECTRICAL SERVICE:
A. Provide a weatherproof, grounded temporary electric power service and distribution system of
sufficient size, capacity, and power characteristics to accommodate performance of work during
the abatement period.
B. Provide temporary electrical panel sized and equipped to accommodate all electrical equipment
required by the work. Connect temporary panel to existing building electrical system. Protect
with circuit breaker or tlised disconnect. Locate temporary panels as directed by the Owner.
C. Provide circuits of adequate size and proper characteristics for each use. In general, run wiring
overhead and rise vertically where wiring will be least exposed to damage from work operations.
D. Protect each circuit with a ground fault circuit interrupter (GFCI) of proper size, located in the
temporary panel. Do not use outlet type GFCI devices.
E. Temporary wiring in the Work Area shall be type UF non-metallic sheathed cable. Provide liquid
tight enclosures or boxes for wiring devices.
F. Provide sufficient branch circuits as required by the work. All branch circuits are to originate at
the temporary electrical panel.
G. Provide sufficient branch circuits as required by the Owner for the collection of his air samples.
3.05 TEMPORARY LIGHTING:
A. Lock out and tag all existing power to lighting circuits in the Work Area as described in Section
07 Temporary Enclosures. Unless specifically noted otherwise, existing lighting circuits to the
Work Area are not to be used. All lighting to the Work Area and Decontamination facilities is to
be provided from temporary electrical panel(s) as described abo\e.
B. Provide lighting in areas where work is being performed as required to supply a 100-foot candle
minimum light level.
C. Provide lighting in any area being subjected to a visual inspection as required to supply a 100-
foot candle minimum light level.
D. Provide lighting in the Decontamination Unit as required to supply a 50-foot candle minimum
light level.
E. Provide sufficient lighting circuits as required by the work. All lighting circuits are to originate at
temporary electrical panel(s).
F. Protect each circuit with a ground fault circuit interrupter (GFCI) of proper size located in the
temporary panel.
3.06 FIRE EXTINGUISHERS:
A. Comply with the applicable recommendations of NFPA Standard 10 "Standard for Portable Fire
Extinguishers". Provide a minimum of four (4) fire extinguisher in each work area, one (1) in the
29
© AMBIENT GROUP, INC. -2002
TEMPORARY FACILITIES
NYC-WTC_000155746