NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/102 GREENWICH 1001054, 53/37
Document / 44 pages

Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37

Page image
Scanned page image, NYC-WTC_000128580
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• Electrical equipment and lines should be considered energized unless tested and determined otherwise.

• Energized parts must be insulated or guarded from employee contact and any other conductive object.

• Extension cords used with portable electrical tools and appliances must be the three- wire grounded type and connected to a GFI (Ground Fault Interrupter) circuit.

• Extension cords:

- Should be protected from accidental damage.

- Should not be fastened with staples, hung from nails, or suspended by wire (tape is an acceptable alternative).

• Portable electrical hand tools should meet the following requirements:

- Should be equipped with a 3-wire cord having a ground wire permanent fixed to the tool frame; or

- Should be of double-insulated type and labeled as such.

• For circuits over 600 volts, if electrical disconnects are not visible and open or locked out, the following requirements should be met:

- Circuits to be de-energized are clearly identified and isolated from all energy sources.

- - Notification received from a designated employee that all switches and disconnectors that could supply energy have been de-energized, locked out, and plainly tagged to show men at work.

- Visual inspections and tests made to assure de-energizing of lines and equipment.

- Protective grounds applied to disconnected lines or equipment.

- Separate tag and lockout attached for each crew requiring de-energizing of same line or equipment.

o Tags and lockouts should not be removed from completed work until designated employees report that all crew members are clear, and protective grounds they installed have been removed.

NYC-WTC 000128580

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128580Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127792

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗
Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000104853 · Box DEP Box 36

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

Cited alongside this record in an Ask answer

Compare copies and versions →