Is the Project Manager the same as the Project Monitor? There must be an EPA Project Manager
or OSC that oversees end coordinates this project
If the EPA has detcnnined that Scope of Work A shall apply to an apartment, but the occupant
requests renediaiioo according to Scope k f Work S. will tl» SPA provide remediation following
the latter?
The Scope of Work does not make clear where occupants will be while the remediation takes
place. Ooeupants should not be present while remediation is condixcted, as most occupants will
not have the proper eertiScation er medical approval necessary to wuar protective equipment and
respirators. Occupanu should not return to their homes until tire posvabatemaxt test results
demonstrate that fte materials have been suecessiblly remediated. If necessary, the federal
government should provide temporary relocation expenses for occupants until their dwellings
h-^ve been successfully remediated.
There mu*n be a post-abatement testing protocol for all hazardous substances, polluunu ud
contaminants that may be presat in wfc debris or that has ben documented as present inside
units. Post-abatement testing must include, but is not limited to, asbestos, dioxin, fibrous
material, fine and ultra fine particulates, lead, and mercury. As previously stated, poet-abatement
Testing must include an equal number ofTaler ovac samples taken following the procedures of
A5TM 5755-95 and analyzed using Tiansmission Electron Microscopy (TEM).
It is also not clear toat die cleaning methods provided In the Scope of Work wilt remediate all of
these materials. For example, simply wet-wiping and KEPA vacuuming may not remediate
mercury. Methods must be en^leyed that will successfully resnediaxe all of these materials.
The Scope of Work must allow a Citixens Advisory Group to split samples so that there can be
iadcpcadcat tut results to compare against that of the contractors.
The Scope of Work roust Include remediation of all KVAC systems and duet work present at the
response site, and all common areas of buildings. Paat-abatement testing must include dust
samples inside the HVaC systems and duet work.
All dust and debris remediated under this contract, and the equipment used to remediate this
material, whether under Scope of Work A or Scope of Work B. must be considered hazardous
waste and disposed of accordingly.
The Scope of Work must include all indoor spaces downtown, including, but not limited to.
commercial buildings and schools.
The Scope of Work must provide for remediation of buildings as a whole, not just unit by unit.
Remediation should not commence until a building has been organized so that the clean up san
be conducted comprehensively and toe threat of wcontamination can be mitigated.
The Scope of Work must be expanded beyond toe arbitrary boundary of Canal Street to include
all areas contaminated by World Trade Cmtcr debns, such as BrooWyn, New Jersey ^nd North
of Canal Street tn Manhattan. In addition, toe ETA must provide traaaXatora to ensure etiTeetive
communication between toe agency and all memben of the community.