NYC 9/11 Public Portal Document
Scope of Work B
Application: A visual inspection was performed and the presence of accumulations of debris (including large or significant amounts of dust) from the collapse of the WTC was identified by EPA or designee.
In some unique circumstances, Scope B may be applied on a limited basis within a unit as determined necessary by the Monitoring Contractor in consultation with EPA._^ Residents be present depending on these unit specific circumstances. In cases where clean up^eas can'be isolated by closing doors or by the erection of containment barriers, the resiident mayfe|prcscnt in the unit. In all other applications of Scope B it is assu^^ that residents will not be'pc^^^^
1. A site specific work plan will be prepared for reviey/ and approval by ER^i^^o tl^jstart of work. This work plan will include detailed procedures for/the removal ^^^^^^debris and the cleaning. J
2. An ACP-7 form asbestos project notification form shall be submittcd, as required by Title 15, Chapter 1 of the RCNY, directly to the NYC DhP Asbestos ControfBrograin prior to the start of work. NYS DOL notification shall be submitted.
3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 15, Chapter 1 RCNY as the work area and the decontamination enclosure system).
4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity (^accerdance^itlrOSHA rules and regulations.~>
5. Warning signs shall bcposted at the approach to thc work area. n 6. A worker decontamination enclosure system shall be installed at the entrance to the work area. A rembted^o^taminatiowraclos^e system shall be considered when appropriate i.e. inability to comply Syithfac. provfsionyMc ito space limitation or other agency rules, such as for complianceivfith® * 's p egressfrequirenients.
7. HVAC systems sh Shulidown and locked out or isolated locally. The site specific work plan shall provide luonal information on the HVAC system and proposed procedures for ' Shutdown or isolation.
8. b/- Isolation barriers,shall be installed with tv/o layers of 6-mil polyethylene sheeting and sealed with tape.
9. "• JNegatiYe pressure ventilation equipment shall be installed and operated during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with the primary unit capacity may be coimected in series.
CITY_21MC100_003754622
NYC-WTC_000209471
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000140517
Departmental comments and requests for clarification regarding cleaning triggers, clearance levels, and supervision requirements.
7 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140511
Draft document outlining regulations and assistance programs for residential cleaning following the World Trade Center collapse.
8 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140504
Contract introduction outlining EPA and DEP assistance programs for residential air sampling and cleaning after the World Trade Center collapse.
8 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140523
Draft scope of work document outlining regulations and procedures for residential dust cleanup and air sampling following the World Trade Center collapse.
8 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154327
Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
8 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
8 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140443
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
8 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140481
Draft contract scope defining compliance requirements and assistance programs for cleaning World Trade Center dust in residences.
8 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140489
Draft scope of work for a DEP and EPA program providing cleaning assistance to residents south of Canal Street.
8 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151471
Letter advising EPA that DEP's Bureau of Environmental Compliance reviewed the draft cleaning contract scope for World Trade Center indoor dust cleaning.
8 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000140517
Departmental comments and requests for clarification regarding cleaning triggers, clearance levels, and supervision requirements.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140462
Work plan detailing procedures for visual inspection, dust removal, and cleaning of residential units under Scope B.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140325
Details protocols for misting debris, HEPA vacuuming, wet wiping surfaces, and conducting visual inspections for dust accumulation.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Departmental comments and requests for clarification regarding cleaning triggers, clearance levels, and supervision requirements.
Similar indexed content
Draft document outlining regulations and assistance programs for residential cleaning following the World Trade Center collapse.
Similar indexed content
Similar indexed content
Contract introduction outlining EPA and DEP assistance programs for residential air sampling and cleaning after the World Trade Center collapse.
Similar indexed content
Draft scope of work document outlining regulations and procedures for residential dust cleanup and air sampling following the World Trade Center collapse.
Similar indexed content