NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 05/SCOPES OF WORK IN DOOR AIR & CLEANING
Document / 1 page

Scope of Work draft for World Trade Center dust cleanup,

Machine-extracted title · confidence 90%

Initial draft outlining regulatory compliance, roles, and the scope of site inspections and cleaning activities for WTC impacted buildings.

NYC-WTC_000140376

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140376
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Sampling Parameters Methods 1. Asbestos NIOSH Methods 7400 & 7402 2. Total Metals EPA Method SW-846 601 OB 3. Mercury EPA Method SW-846 7471A

D, Specifications

Clean up activities shall be scheduled for 20 units per day. .Air sampling shi id and completed in these units upon successfill visual inspection by the Project Monitor within 24 hours. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The contractor shall have available sufficient quantities of sampling equipment to provide the amount and type of samples required for this project. At a minimum, the following equipment is required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.8um.

The Monitoring Contractor shall prepare a He^^and Safety Plan (HASP) in accordance with 29 CFR1910.1001 and 29 CFR 1926.58. AH personnel involved in residential cleaning and monitoring activities shall follow the contractor Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided wife a eop\ of the employer .HASP prior to the start of work.

The Project Monitor shall t^end a kick off meeting prior to commencement of sampling activities. At this time, the Contractor shall, but not limited to, participate in scope of work discussions, sampling logistics, obtaining resources for residential information provided by EPA and DEP and ‘ demonstrating ■ ■■■ n procedures and software. ‘ acquisi data

The Contractor shall attend kgs or conference calls with EPA and coordinate field activities, as requested.

All appropriate data, original field forms/data sheets, and chain-of-custody forms shall be completed in accordance with the instructions contained in the contract and provided to EPA. All samples and copies“6f necessary’documentation shall be hand delivered to EMSL laboratories at: 307 W. 38* St., New York. \cw York 212-290-0051. This information may also be provided via FormsII Lite (F2L) or an alternative electronic format that is accessible by the laboratory.

Deliverables

All deliverables shall be provided via F2L or an agreed upon alternative electronic format approved by USEPA and DEP.

NYC-WTC_000140376

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140376Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →