OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

with residents.

Technicians < T : T- Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. TechaieiansWust have performed for'sampling for at least 6 months. :

Sampling Parameters Method ■ ■ 1. Asbestos NIOSl f Methods 7400 & 7402 2. Total Metals EPA Method SWT46 601 OB 3. Mercury ■ EPA Method SW-846 7471

D. Specifications

(dean up activities shal 1 be scheduled for 20 units per day. Air sampling shall be scheduler! and completed in these units upon successful visual inspection by the Project Monitor within 24 hours. Air sampling shall also be provided at 10 to 20 units where clean up act i\ ities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The contractor shall Iwe available sufficient quantities o('sampling equipment to pmvide the amomit and 'type of samples required for this project At a minimum the fol lov, ing equipment is required:air-sampling pumps with flow rate capacities of 1 fl liters per minute, tripods, rotometers. sample cassettes with mixed cellulose ester filters having pore size of 0.Sum.

The Monitoring Contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFRl 910.1001 and 29 CI'R 1926.58. All personnel involved in residential cleaning and moBitoring activities shall follow the contractor Health and Safety Plan (HASP) prepared by their employer. 1 iPA shall be provided with a copy of the employer 1 IASI* prior to the start of work.

The Project Monitor .shall attend a kick off mecti ng prior to commencement of sampling activities. At this lime, the Contractor shall, but not limited to, participate in scope ofwork discussions, sampling logistics, obtaining resources for residential information provided by EPA and DEP and demo'nstrating data acquisition procedures and software.

1'he Contractor shall attend meetings or conference calls with EPA and coordinate fieldactivities, as requested. - • •

All appropriate data, original field fonns/data sheets, and chain-of-custody forms shal I be completed in accordance with the instructions contained in the contract and provided to EPA. All samples aixl copies ofneeessary doeunientation shall be hand delivetod to EMSLlaboratories at: 307 W. 38* St., New York, New York 212-290-0051. This infomation may also/be provided wia FonnsII Lite (F2L) or an alternative electronic format that is accessible by the laboratory.

NYC-WTC_000162447

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000162447Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →