NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 18 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139482–000139499
Page image
Scanned page image, NYC-WTC_000139490
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Sampling Parameters Methods 1. Asbestos NIOSH Methods 7400 & 7402 2. Total Metals EPA Method SW-846 601 OB 3. Mercury EPA Method SW-846 7471

D. Specifications

Clean up activities shall be scheduled for 20 units per day Air sampling ipling shall be scheduled and completed in these units upon successful visual inspection by the Project Monitor within 24 hours. Air sampling shall also be provided at 10 to 20 units where deep up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The contractor shall have available sufficient quantities of samplingW|i||pehtdo provide the amount and type of samples required for this project. At a minimumthe following equipment is required: air­ sampling pumps with flow rate capacities of 10 liters^ per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters laving pore size of 0,Sum,

The Monitoring Contractor shall prq^^ a Health and Safety Plan (HASP) in accordance with 29 CFR1910.1001 and 29 CFR 1926.58, All perscBnel involved in residential cleaning and monitoring activities shall follow the com f Healtly^^ Safety Plan (HASP) prepared by their employer. HPA shall beprovided with a cop] of the employer HASP prior to the start of work.

The Protect Monitor shaW » k' ck off rheetmg prior to commencement of sampling activities. At this time, th< Contractof^ < J^yiot limited to, participate in scope of work discussions, sampling logistic obtaining re: residential information provided by EPA and DEP and demonstrating,;^ Oon proCgOibs and software. W" The Conf^ctor shaU ad meetings or conference calls with EPA and coordinate field activities. as r^fested.

ojj|inal field forms/data sheets, and chain-of-custody forms shall be completed »instructions contained in the contract and provided to EPA. All samples and copiesofnecessary d bcumentation shall be hand delivered to EMSL laboratories at: 307 W. 38* St., Jew York 212-290-0051. This information may also be provided viaFormsII Lite (F2L) ofW tive electronic format that is accessible by the laboratory.

Deliverables

All deliverables shall be provided via F2L or an agreed upon alternative electronic format approved jy USEPA and DEP.

NYC-WTC_000139490

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139490Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →