NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 18 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139482–000139499
Page image
Scanned page image, NYC-WTC_000139489
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program Monitoring Contract Scope of Work DRAFT - 6/24/02

A. Introduction All work performed under this contract must be in compliance with all applicable, ^^bvant, and appropriate regulations and this Scope of Work, including but not limited to thq^^^bf the United States Environmental Protection Agency (EPA), the United States Department of Labor, Occupational Safety and Health Administration (OSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental La^ratory Approval Program (ELAP) and the New York City Def^ment of Environmental Protection (NYCDEP). This project shall involve site inspections, passessmenn ys, and assessments^ sashed; coordinating and monitoring the clean up of dust/debri -- liing_ js.. from buiL lents impacted by the collapse of the World Trade Center.

B, Roles and Responsibilities The USEPA has overall responsibility for insuring :ork conduCtec of the Indoor Air Residential Assistance Program is completed safely, efriciently and in a Compliance with the Scope of Work. As such, EPA shall have the following authorities relatingJ0%ork conducted under this contract:

1. The authority to stop work ^^alth apiBafety recons or for non-compliance with the Scope of Work.

2. The authority to direct the contractor in the performance of the work.

The authority to tpprove dr disapprove of the qualifications of all contractor P' Jved i]^

4. The right to re ifefcinspi Accept or reject any work . I x^'

cations Proof of qualifications must be presented upon request, including qualifications for wipe sampling, pilHoal monitoring:::^ HVAC evaluations.

IS®®; The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre cleaning unit inspections with residents.

NYC-WTC_000139489

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139489Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →