NYC 9/11 Public Portal Document
Indoor Air Residential Assistance Program
Monitoring Contract Scope of Work
DRAFT-7/2/02
A. Introduction ■ / •
All work performed under this contract must be in comptiance with all applicable, relevant, and
■appropriatcregulations^andthis'Scdpe of Work, including hut not limited to those ofthe United States
Einironmental Protection Agency (EPA), the I Ini ted States Dcparnneni of Labor, Occupational Safety
and Health AdmiiastratiGn (OSHA), the New Aork State Department of L.abor (NYSDOL), the New
York State Department of Health Environmental Laboratory Approval Program (EI.AP) and the New
York City Department of Environmental Protection (NYCDEP). This project ■.f.-Ji 'r ■
inspections, surveys, and assessments, scheduling, coordinating and monitoring the dean up of
dust/debris and sampling from building apartments impacted by the collapse of the World Trade
Center. ' ; .
B. Roles and Responsibilities
The USEPA has overall responsibility for insuring that work conducted as part ofthe Indoor Air
Residential Assistance Program is completed safeh. efficiently and in a compliance with the Scope of
Work. As such, EPA shall have the following authorities relating to work conducted under this
contract: \
1. The authority to stop work for health and safely reasons or for non-compliance with the Scope
of Work .
2. The authority to direct the cuiUractor in the performance of the work.
3. The authority to review and approve or disapprove of the qualifications of all contractor
personnel involved in the worL
4, The right to receive, inspect and accept or reject any work .
C. Qualifications >
Proof of qualifications must be presented upon request, including qualifications for wipe sampling,
personal monitoring and HVAC evaluations. ■
Project Kfopitors ■ : U ' T • ■ : < y
TheYfqject Monitors must possess valid NYS Asbestos Project Monitor ceftifieates.TrQ3ect Monitors
must have served as a third party project monitor on at least 2ti asbestos abatement projects. Project
Mohitor inust have performed final clearance inspections on at least 50 asbestos abatement projects.
The Project Monitor must have access to translation services to schedule pre cleaning unit inspections
NYC-WTC_000163872
OCR can misread numbers and units. Confirm readings against the page image before using them.