Revised scopes of work for cleaning and monitoring, July 2002

Machine-extracted title · confidence 88%

EPA transmits revised statements of work for WTC cleaning and monitoring activities incorporating modifications and additions discussed in interagency meeting.

NYC-WTC_000163864–000163882

Folder label: “E-mails M. Gilsenan 2002

Page image
Scanned page image, NYC-WTC_000163871
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Equipment shall ran continuously until clearance air monitoring. A minimum ofone air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with the primary unit capacity may be connected in series.

10. All WTC debris shall bemisted and double-bagged. Accumulation of water is prohibited. Water misting shall be sufficient to wet the material without water aeGumulations. After the removal of debris, all surfaces shall be HEPA vacuumed and wet wiped. Encapsulating agents shall not be applied. Once all surfaces have been HEPA vacuumed and wet wiped, a second cleaning shaU be performed. Surfaces include but are not limited to walls, floors, ceilings, ledges, trims appliances and equipment and furnishings.

11. Ifidentified by the Monitoring Contractor during initial site visit, surfaces that nr ; i* ■! I x- ; v' iped shall be HEPA vacuumed three times or disposed as ACM waste. Disposal of residents personal propefty may not occur without prior authorization by EPA and the owner.

12. A cleaning checklist (to be developed) will be completed by the supervisor at the completion ofthe cleaning.

13. A thorough visual inspection will be conducted by the Project Monitor to veri fy the absence ofvisible dust accumulations. Additional clean-up procedures shalI be performed where visible dust is observed.

14. After successiul clearance air monitoring isolation barriers shall be removed in conjunction with the use of a HEPA vacuum*. SKf <

15. Air sampling shall be performed by the Air Sampling Technician after the area is free of dust accumulations as determined by the Project Monitor. ;

16. Any damage or loss to that occurs during cleaning is the responsibility ofthe cleaning contractor. The cleaning. i i r. ।. >r i •- not responsible for damage or loss eausCd by the acts Of parties not involved in the cleanup.

12. A11 work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 ofthe Rules of the City of New York and New York Industrial Code Rule 56. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

18; Ifmold is observed, the cleaning contractor will contact the Monitoring Contractor who will contact the NYCDOH and EPA.

NYC-WTC_000163871

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163871Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →