Revised scopes of work for cleaning and monitoring, July 2002

Machine-extracted title · confidence 88%

EPA transmits revised statements of work for WTC cleaning and monitoring activities incorporating modifications and additions discussed in interagency meeting.

NYC-WTC_000163864–000163882

Folder label: “E-mails M. Gilsenan 2002

Page image
Scanned page image, NYC-WTC_000163870
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work B

Applfcation : A visual inspection was perfornied anti the presenceof aceumnlations of dust or debris including large or signlflcant amoottOnfdttst or debris in resldental units or portions thereof such as windows, terraces or balconies) from the collapse of the WTC was Identifled by EPA or designee.

Residents may be present depending on these unit'specific circumstances. In cases where clean up areas can be isolatedby closing doors orby theerection ofcontaiament barriers, the resi Jeni nun-be present in the unit. In all other.applications of Scope B it is assumed that residents will not be present.

1. A site specific work plan will be prepared for review and approval by EP A prior to the start o f work. This work plan will include detailed procedures for the removal ofdust and debris and the cleaning.

2, An A,GP-7 form asbestos project notification I'orm shal 1 be submitted, as required by Title IS, Chapter 1 oftheRCNY, directly to the NYC DEP Asbestos Control Program priortothe start of work. NYS DOL notification sha.ll be submitted.

3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title J5, Chapter 1 RCNY as the work area and the decontamination enclosure system).

4. I’ersonal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity.

[Did we hear from David I ppalito regarding the implications of deleting “in accordance with OSHA rules and regulations” from stem 4 above?!

5. A’arning signs shall be posted at the approach to the work area.

6. A worker decontamination enclosure system shall be installed at the entrance to the work area. A remote decontamination enclosure system, shall be considered when appropriate i.e. in.ability to comply with the provision due to space limitation or other agency rules, siwdias for compliance with N\'CEI) egress requirements.

7. HVAC systems shall be shut down and locked out or isolated locally. The site specific work plan shall provide additional information on the HVAC system and proposedprocedures for shutdown or isolation.

8. Isolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed with tape. y

9. Negative pressure ventilation equipment shall be installed and operated during all clean-up activities.

NYC-WTC_000163870

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163870Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →