NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

NYC-WTC_000209460

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000209460–000209466
Page image
Scanned page image, NYC-WTC_000209466
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

second negative pressure ventilation unit compatible with the primary unit capacity may be connected in series.

10. All WTC debris shall be misted and double-bagged. Accumulation of water is prohibited. Water misting shall be sufficient to wet the material without water accumulations. After the removal of debris, all surfaces shall be H EPA vacuumed and wet wiped. Encapsulating agents shall not be applied. Once all surfaces have been HEPA vacuumed and wet wiped, a second cleaning shall be performed. Surfaces include but are not limitedfo walls, floors, ceilings, ledges, trims appliances and eauipment and furnishings.

11. If identified by the Monitoring Contractor during initial site visit, surfaces that may not be wet wiped shall be HEPA vacuumed three tim<js or disposed as ACM waste. Disposal of residents personal property may not occur without prior authorization by EPA and the owner./I"" Iw/'- 'Yr : ■ - -

12. A cleaning checklist (to be developed) will be completed by the supervisor at the completion of the cleaning.

13. A thorough vi sual inspection will be cond ucted by the Project Monitor to verify the absence of visible dust accumulations. Additional clean-up procedures shall be performed where visible dust is observed.

14. After successful clearance air monitoring isolation barriers shall be removed in conjunction with the use of a HEPA vacuum.

15. Air sampling shall be performed by the Ai r Sampling Technician after the area is free of dust accumulations as determined by the Project Monitor.

16. Any damage or loss to that occurs during cleaning is the responsibility of the cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved in the cleanup.

17. All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the Rules of the City of New York and New York Industrial Code Rule 56. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

18, If mold is observed, the cleaning contractor will contact the Monitoring Contractor who will contact the N'YCDOH and EPA.

CITY_21MC100_000438993 NYC-WTC_000209466

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000209466Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140504 · Box DEP Box 05

Contract introduction outlining EPA and DEP assistance programs for residential air sampling and cleaning after the World Trade Center collapse.

Similar indexed content

NYC-WTC_000140517 · Box DEP Box 05

Departmental comments and requests for clarification regarding cleaning triggers, clearance levels, and supervision requirements.

Similar indexed content

NYC-WTC_000140481 · Box DEP Box 05

Draft contract scope defining compliance requirements and assistance programs for cleaning World Trade Center dust in residences.

Similar indexed content

Compare copies and versions →