NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 18 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139482–000139499
Page image
Scanned page image, NYC-WTC_000139488
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

All WTC debris shall be misted and double-bagged. Accumulation ofwater is prohibited. Water misting shall be sufficient to wet the material without water accumulations. After the removal of debris, all surfaces shaU be HEPA vacuumed and wet wiped. Encapsulating agents shall not be applied. Once all surfaces have been HEPA vacuumed and wet wiped, a second cleaning shaU be performed. Surfaces include but are not limited to walls, floors, ceilings, ledges, trims appliances and equipment and fiimishings.

If identified by the Monitoring Contractor during initial site visit, surfaces that may not be wet wiped shall be HEPA vacuumed three times or disposed as ACM waste. Disposal of residents personal property may not occur without prior authorization by EPA and the owner.

A cleaning checklist (to be developed) will be comj^ed by the supervisee at the completion of the cleaning.

A thorough visual inspection will be conducted by th Iiy^onitor to verify the absence of visible dust accumulations. Additional clean-up pro performed where visible dust is observed.

After successful clearance air monitoring isolation barrier;s shall bi^^lSved in conjunction with •’•’•'•••••'•X'X*r*x**%*****x*x**%%**%%%******' the use of a HEPA vacuum. 11 Air sampling shall be performed by the Air Sampling after the area is free of dust accumulations as determined by the Project Monitor.

Any damage or loss to tl^^ccurs during cleatling is the responsibility of the cleaning contractor. The clears mtractor is not responsible for damage or loss caused by the acts ofpan.es 3t involv^B Cleanup. IF AU work.Shelbern com] - all other applicable requirements of Title 15, Chapter 1 of the Rules oftheChvofNewYori Id New York Industrial Code Rule 56. Transportation and dispOi edwasfBli be in compliance with all applicable rules and regulations.

Ihfhbld is observedinto cleaning contractor will contact the Monitoring Contractor who will JBntact the NYCDOH and EPA w IF

.... .....

NYC-WTC_000139488

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139488Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →