ope of WorkB
application: A visual inspection was performed and the presence of accumulations of debris (including
arge or significant amounts of dust) from the collapse of the WTC was identified by EPA or designee.
: ~. some unique circumstances. Scope B may be applied on a limited basis within a unit as determined
- 3cessary by the Monitoring Contractor in consultation with EPA. Residents may be pt^Bht depending
a these unit specific circumstances. In cases where clean up areas can be isolated by closing doors or
' / the erection of containment barriers, the resident may be present in the unit. In all other applications
' Scope B it is assumed that residents will not be present.
Il
III
A site specific work plan will be prepared for review/lhd approval by EPA , le start of
work. This work plan will include detailed procedi for the removal oft j^nsand
the cleaning. ■ ■r iliW.
An ACP-7 form asbestos project notification form shall be S 1, as required by Title 15,
Chapter 1 ofthe RCNY, directly to the NYC DEP AsbestoS Isogram prior to the start
of work. NYS DOL notification shall be subrnittei
At least one asbestos supervisor shall be »en L (work place is defined in
Title 15, Chapter 1 RCNY as the w<w area Ltion enclosure system).
Personal protective equipment including disposable clothing, gloves, and respirators shall be
worn during this clean-up actmty in accordance with OSHA rules and regulations.
Wamipg,signs shall be,^bst|d at the ) the work area.
A. V A ntamination enclosure system shall be installed at the entrance to the work area.
A remote d ntaminationenclosure system shall be considered when appropriate i.e. inability
to compf h Ute provision due to space limitation or other agency rules, such as for
compliant egress requirements.
HVAC systems s1m| 3C shut down and locked out or isolated locally. The site specific work
shall provide a| littonal information on the HVAC system and proposed procedures for
shutdown or isolat^
II l?l'
ilation barrii Il be installed with two layers of 6-niil polyethylene sheeting and sealed
Illiwtthti
'Wil
ive pressure ventilation equipment shall be installed and operated during all clean-up
activities. Equipment shall run continuously until clearance air monitoring. A minimum of one
air change every 30 minutes shall be provided. When ducting to the outside is not possible, a
second negative pressure ventilation unit compatible with the primary unit capacity may be
connected in series.