NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 18 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139482–000139499
Page image
Scanned page image, NYC-WTC_000139487
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ope of WorkB

application: A visual inspection was performed and the presence of accumulations of debris (including arge or significant amounts of dust) from the collapse of the WTC was identified by EPA or designee.

: ~. some unique circumstances. Scope B may be applied on a limited basis within a unit as determined - 3cessary by the Monitoring Contractor in consultation with EPA. Residents may be pt^Bht depending a these unit specific circumstances. In cases where clean up areas can be isolated by closing doors or ' / the erection of containment barriers, the resident may be present in the unit. In all other applications ' Scope B it is assumed that residents will not be present. Il III A site specific work plan will be prepared for review/lhd approval by EPA , le start of work. This work plan will include detailed procedi for the removal oft j^nsand the cleaning. ■ ■r iliW. An ACP-7 form asbestos project notification form shall be S 1, as required by Title 15, Chapter 1 ofthe RCNY, directly to the NYC DEP AsbestoS Isogram prior to the start of work. NYS DOL notification shall be subrnittei

At least one asbestos supervisor shall be »en L (work place is defined in Title 15, Chapter 1 RCNY as the w<w area Ltion enclosure system).

Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up actmty in accordance with OSHA rules and regulations.

Wamipg,signs shall be,^bst|d at the ) the work area.

A. V A ntamination enclosure system shall be installed at the entrance to the work area. A remote d ntaminationenclosure system shall be considered when appropriate i.e. inability to compf h Ute provision due to space limitation or other agency rules, such as for compliant egress requirements.

HVAC systems s1m| 3C shut down and locked out or isolated locally. The site specific work shall provide a| littonal information on the HVAC system and proposed procedures for shutdown or isolat^ II l?l' ilation barrii Il be installed with two layers of 6-niil polyethylene sheeting and sealed Illiwtthti 'Wil ive pressure ventilation equipment shall be installed and operated during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with the primary unit capacity may be connected in series.

NYC-WTC_000139487

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139487Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →