NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 11/CONTRACTS CONTRACTORS - See: $ matrics etc file
Document / 2 pages

Asbestos project monitor and air sampling contract terms, June 2002

Machine-extracted title · confidence 100%

Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.

NYC-WTC_000151286–000151287

Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file

Page image
Scanned page image, NYC-WTC_000151286
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT

A. Introduction

All work perfoimed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Wc"k, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling fi-om building apa’lments in the vicinity of the World Trade Center explosion site.

B. Qualifications

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects.

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Proof of qualifications must be presented upon request.

Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45um(TEM).

C. Specifications

Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units wh;re clean up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be as follows:

1. The Project Monitors shall be responsible for receiving information fi-om the EPA Hotline, scheduling cleaning-up activities and air sampling with the tenants/owners, asbestos abatement contractors and air monitoring technicians to the various apartments.

NYC-WTC_000151286

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000151286Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000151127 · Box DEP Box 11

A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.

Filed in the same folder

NYC-WTC_000151141 · Box DEP Box 11

Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.

Filed in the same folder

Compare copies and versions →