7 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Asbestos project monitor and air sampling contract terms, June 2002
Machine-extracted title · confidence 100%Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.
NYC-WTC_000151286–000151287Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT
A. Introduction
All work perfoimed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Wc"k, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling fi-om building apa’lments in the vicinity of the World Trade Center explosion site.
B. Qualifications
Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects.
Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.
Proof of qualifications must be presented upon request.
Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45um(TEM).
C. Specifications
Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units wh;re clean up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.
The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be as follows:
1. The Project Monitors shall be responsible for receiving information fi-om the EPA Hotline, scheduling cleaning-up activities and air sampling with the tenants/owners, asbestos abatement contractors and air monitoring technicians to the various apartments.
NYC-WTC_000151286
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140337
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document outlining scope of work for asbestos abatement contractor and environmental monitoring at 125 Cedar Street.
5 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140330
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139460
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
7 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139168
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
5 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.
Filed in the same folder
Report establishing health-based screening levels for the indoor environment with cross-agency representation.
Filed in the same folder
Confidential cover sheet from the U.S. Environmental Protection Agency regarding a specific confirmation item.
Filed in the same folder
NYC-WTC_000151148
EPA coordination memo regarding identification and contact of eligible apartment requests for WTC testing and cleaning.
Filed in the same folder
Summary of issues raised by contractors including chain of custody, mold, lead paint, and payment disputes.
Filed in the same folder