machine-extracted · confidence unavailable · Check page ↗Asbestos project monitor and air sampling contract terms, June 2002
Machine-extracted title · confidence 100%Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.
NYC-WTC_000151286–000151287Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document F
2. Air monitoring technicians must be - .-site during clean-up activities to collect final clearance samples. 3. The Project Monitor shall ensure that the clean up activities comply with the NYCDEP Scope of Work.
Post Clean-up Air Sampling Procedure must be as followed:
a) Sampling shall not begin until a visual inspection confirms the absence of visible debris.
b) All surfaces must be completely dry prior to the start of sampling.
c) Sampling equipment shall be placed at representative locations within the work area and away from obstructions. The sampling cassette must be placed on a tripod and not taped to existing surfaces.
d) Air conditioning units where applicable shall be run/operated at least 15 minutes prior to the start of sampling. The air conditioning units shall operate continuously throughout the sampling. HVAC systems shall be in operation during sampling.
e) Forced air equipment (e.g. leaf blowers) may be used only after written authorization by the occupant or his/her authorized representative. The project manager shall advise the occupant or his/her authorized representative on the advantages and disadvantages regarding the use of the equipment and obtain the individual’s signature authorizing use. Before the start of sampling, forced air equipment (such as a 1 horsepower leaf blower) may be used to direct exhaust air against walls, ceilings, floor, ledges and other surfaces. When directing the exhaust, caution shall be taken to minimize disturbance and potential damage to furnishings and personal belongings.
f) One 20-inch fan shall be installed per 10,000 cubic feet of room space and run at low speed. The fan shall operate continuously throughout sampling and shall not be turned off until sampling is completed.
g) For studio apartments 3 samples shall be collected. For 1-bedroom apartments and above 5 samples shall be collected. Technicians shall collect a volume of3000 liters per sample using a flow rate of 10 liters per minute.
h) Samples must be labeled and accompanied with completed chain of custody forms before shipping to the designated laboratory.
i) Project Monitor shall perform all final visual inspections.
j) All information must be maintained on a data based software program that is acceptable to the USEPA.
4. Project reports, including a project completion sign-off signed by the project monitor and the occupant or his/her authorized representative, must be typed and forwarded to USEPA with a copy to NYCDEP.
NYC-WTC_000151287
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140337
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document outlining scope of work for asbestos abatement contractor and environmental monitoring at 125 Cedar Street.
5 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140330
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139460
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
7 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139168
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
5 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151295
Contract document dated June 11, 2002, outlining scope of work for debris cleanup monitoring and air sampling at the World Trade Center site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.
Filed in the same folder
Report establishing health-based screening levels for the indoor environment with cross-agency representation.
Filed in the same folder
Confidential cover sheet from the U.S. Environmental Protection Agency regarding a specific confirmation item.
Filed in the same folder
NYC-WTC_000151148
EPA coordination memo regarding identification and contact of eligible apartment requests for WTC testing and cleaning.
Filed in the same folder
Summary of issues raised by contractors including chain of custody, mold, lead paint, and payment disputes.