Asbestos project monitor contract for WTC vicinity, Aug 2002

Machine-extracted title · confidence 100%

Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.

NYC-WTC_000140603–000140614

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140604
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2. Air monitoring technicians must be on-site during clean-up activities to collect final clearance samples. 3. The Project Monitor shall ensure that the clean up activities comply with the NYCDEP Scope of Work.

Post Clean-up Air Sampling Procedure must be as followed:

a) Sampling shall not begin until a visual inspection confirms the absence of visi ble debris.

b) All surfaces must be completely dry prior to the start of sampling.

c) Sampling equipment shall be placed at representative locations within the work area and away fi-om obstructions. The sampling cassette must be placed on a tripod and not taped to existing surfaces.

d) Air conditioning v Jts where applicable shall be run/operated at least 15 minutes prior to tl e start of sampling. The air conditioning units shall operate continuously thioughout the sampling. HVAC systems shall be in operation during sampling.

e) Forced air equipment (e.g. leaf blowers) may be used only after written authorization by the occupant or his/her authorized representative. The project manager shall advise the occupant or his/her authorized representative on the advantages and disadvantages regarding the use of the equipment and obtain the individual’s signature authorizing use. Before the start of sampling, forced air equipment (such as a 1 horsepower leaf blower) may be used to direct exhaust air against walls, ceilings, floor, ledges and other surfaces. When directing the exhaust, caution shall be taken to minimize disturbance and potential damage to furnishings and personal belongings.

f) One 20-inch fan shall be installed per 10,000 cubic feet of room space and run at low speed. The fan shall operate continuously throughout sampling and shall not be turned off until sampling is completed.

g) For studio apartments 3 samples shall be collected. For 1-bedroom apartments and above S samples shall be collected. Technicians shall collect a volume of3000 liters per sample using a flow rate of 10 liters per minute.

h) Samples must be labeled and accompanied with completed chain of custody forms before shipping to the designated laboratory.

i) Project Monitor shall perform all final visual inspections.

j) All information must be maintained on a data based software program that is acceptable to the USEPA.

4. Project reports, including a project completion sign-off signed by the project monitor and the occupant or his/her authorized representative, must be typed and forwarded to USEPA with a copy to NYCDEP.

NYC-WTC_000140604

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140604Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →